![ThermoFisher Scientific Ozone Primary Standard 49iQPS Instruction Manual Download Page 188](http://html1.mh-extra.com/html/thermofisher-scientific/ozone-primary-standard-49iqps/ozone-primary-standard-49iqps_instruction-manual_1105615188.webp)
Servicing
49iQPS Photometer DMC
6-32
49iQPS Instruction Manual
Thermo Scientific
Use the following procedure to remove the Photometer DMC and replace
the board.
Equipment required:
Phillips drive, #2
1.
Turn instrument OFF, unplug power cord, and remove the cover
(
Figure 2–1
).
2.
Unplug DMC cable, top connector (photometer DMC board to
pressure/flow board).
3.
Unplug DMC cable, bottom connector (photometer DMC board to
ozonator DMC board).
4.
Disconnect 6X plumbing.
5.
Using a #2 Phillips drive, unfasten 6X captive hardware.
Figure 6–38.
Photometer DMC Removal
Photometer DMC
Removal
Summary of Contents for Ozone Primary Standard 49iQPS
Page 1: ...49iQPS Instruction Manual Ozone Primary Standard 117434 00 1Apr2020...
Page 2: ......
Page 8: ......
Page 31: ...Operation Instrument Display Thermo Scientific 49iQPS Instruction Manual 3 7...
Page 142: ......
Page 208: ......
Page 216: ......
Page 234: ......
Page 242: ......
Page 254: ......
Page 255: ......