![ThermoFisher Scientific Ozone Primary Standard 49iQPS Instruction Manual Download Page 170](http://html1.mh-extra.com/html/thermofisher-scientific/ozone-primary-standard-49iqps/ozone-primary-standard-49iqps_instruction-manual_1105615170.webp)
Servicing
I/O Replacement
6-14
49iQPS Instruction Manual
Thermo Scientific
Use the following procedure to replace the I/O boards.
1.
Turn instrument OFF, unplug power cord, and remove the cover
(
Figure 2–1
).
2.
Swing arm open.
Figure 6–15.
I/O Replacement, Arm
3.
Pull board upwards.
Figure 6–16.
I/O Replacement, Remove Board
I/O Replacement
Summary of Contents for Ozone Primary Standard 49iQPS
Page 1: ...49iQPS Instruction Manual Ozone Primary Standard 117434 00 1Apr2020...
Page 2: ......
Page 8: ......
Page 31: ...Operation Instrument Display Thermo Scientific 49iQPS Instruction Manual 3 7...
Page 142: ......
Page 208: ......
Page 216: ......
Page 234: ......
Page 242: ......
Page 254: ......
Page 255: ......