60
Shandon Excelsior ES Operator Guide
This will remove any remaining wax from the reaction
•
chamber.
The unload procedure will continue by highlighting the
•
current clearant bottle and the Ex 2 position bottle.
Confirm that bottle Ex 2 is empty and select [UNLOAD] to
•
continue to remove the reagents.
Remove bottle Ex 2 and dispose of in accordance with local
•
procedures and regulations.
Place another empty bottle in the Ex 2 position and follow
•
the screen instructions to remove the remaining clearant
reagents.
When the last clearant reagent has been unloaded, the screen
•
instructions will prompt you to select [START] for another
flush run.
This will remove any remaining clearant reagent from the
•
reaction chamber.
Remove the F1 and F2 bottles from the cabinet, and select
•
[UNLOADED].
Dispose of the waste reagent in accordance with local
•
procedures and regulations.
Start another flush using the water in F3.
•
Remove the Fix 1 and Fix 2 bottles from the cabinet and
•
select [UNLOADED].
Dispose of waste reagents in accordance with local procedures
•
and regulations.
The unload procedure will continue by highlighting the
•
current dehydrant bottle and the Ex 1 position bottle.
Summary of Contents for Shandon Excelsior ES
Page 1: ...Shandon Excelsior ES Operator Guide English A78410120 Issue 3...
Page 5: ...5 Shandon Excelsior ES Operator Guide...
Page 12: ...12 Shandon Excelsior ES Operator Guide...
Page 22: ...22 Shandon Excelsior ES Operator Guide...
Page 62: ...62 Shandon Excelsior ES Operator Guide...
Page 101: ...101 Shandon Excelsior ES Operator Guide...
Page 103: ...103 Shandon Excelsior ES Operator Guide...
Page 104: ...104 Shandon Excelsior ES Operator Guide...