33
Shandon Excelsior ES Operator Guide
1. Replace the wax.
Open the cabinet doors, and take out the waste wax tray
•
WW. The Quality Control screen appears.
Take the second waste wax tray WW supplied with the
•
instrument, and put it, with a new liner, back in the
cabinet. In the Quality Control screen, highlight WW
and select [CONFIRM EMPTY].
Add paraffin
•
wax pellets to the empty wax bath W3.
Highlight wax, and select [START HEATING]. While
the wax is heating, go to 2 below.
2. Replace alcohol and xylene.
Take out containers
•
Ex1
(waste alcohol) and
Ex2
(waste
xylene) and dispose of them.
Place fresh 100 % alcohol and fresh xylene into positions
•
Ex1
and
Ex2
.
In the Quality Control screen highlight the text under
•
alcohol and select [NEW]. Highlight the text under
xylene and select [NEW].
3. Transfer reagents to concealed bottles
.
Before continuing, ensure that the wax level is correct.
•
Running your next process completes the reagent rotation
•
.
Summary of Contents for Shandon Excelsior ES
Page 1: ...Shandon Excelsior ES Operator Guide English A78410120 Issue 3...
Page 5: ...5 Shandon Excelsior ES Operator Guide...
Page 12: ...12 Shandon Excelsior ES Operator Guide...
Page 22: ...22 Shandon Excelsior ES Operator Guide...
Page 62: ...62 Shandon Excelsior ES Operator Guide...
Page 101: ...101 Shandon Excelsior ES Operator Guide...
Page 103: ...103 Shandon Excelsior ES Operator Guide...
Page 104: ...104 Shandon Excelsior ES Operator Guide...