65
Shandon Excelsior ES Operator Guide
Select
[iMMEDiATE START]
or
[DElAyED START]
,
according to the current program, for daytime or overnight
processing.
The monitoring screen is displayed, shown below.
The status is shown as
‘first fill - wait’.
Ensure that:
The first reagent is drawn into the reaction chamber, and
•
the status line changes
The monitoring screen shows that the chamber is filled to
•
the correct level.
The baskets are completely covered with reagent.
•
Monitoring the
Process Start
Summary of Contents for Shandon Excelsior ES
Page 1: ...Shandon Excelsior ES Operator Guide English A78410120 Issue 3...
Page 5: ...5 Shandon Excelsior ES Operator Guide...
Page 12: ...12 Shandon Excelsior ES Operator Guide...
Page 22: ...22 Shandon Excelsior ES Operator Guide...
Page 62: ...62 Shandon Excelsior ES Operator Guide...
Page 101: ...101 Shandon Excelsior ES Operator Guide...
Page 103: ...103 Shandon Excelsior ES Operator Guide...
Page 104: ...104 Shandon Excelsior ES Operator Guide...