Thermo Scientific
43iQ Instruction Manual
2-1
Chapter 2
Installation and Setup
Installation and Setup describes how to unpack, setup, and start-up the
instrument. The installation should always be followed by instrument
calibration as described in the “
” chapter of this manual.
Equipment Damage
Do not attempt to lift the instrument by the cover or
other external fittings.
▲
The 43iQ is shipped complete in one container. If there is obvious damage
to the shipping container when you receive the instrument, notify the
carrier immediately and hold for inspection. The carrier is responsible for
any damage incurred during shipment.
Use the following procedure to unpack and inspect the instrument.
1.
Remove the instrument from the shipping container and set it on a
table or bench that allows easy access to both the front and rear.
2.
Remove the cover to expose the internal components. (See “
3.
Check for possible damage during shipment.
4.
Check that all connectors and circuit boards are firmly attached.
5.
Re-install the cover.
6.
Remove any protective plastic material from the case exterior.
Unpacking and
Inspection
Summary of Contents for 43iQ
Page 1: ...43iQ Instruction Manual Sulfur Dioxide Analyzer 117568 00 1Sep2021 ...
Page 2: ......
Page 8: ......
Page 18: ......
Page 34: ...Operation Instrument Display 3 8 43iQ Instruction Manual Thermo Scientific ...
Page 162: ......
Page 170: ......
Page 180: ......
Page 228: ......
Page 238: ......
Page 262: ......
Page 270: ......
Page 282: ......
Page 283: ......