Maintenance
Pump Rebuilding
Thermo Scientific
43iQ Instruction Manual
5-3
6.
Remove connection rod disc and diaphragm spacers from the threaded
pin of the diaphragm.
7.
Push the connection rod disc and the diaphragm spacers in this order
onto the threaded pin of the new diaphragm.
8.
Move the connecting rod to the upper point.
9.
Screw the new diaphragm with connection rod disc and spacers
clockwise onto the connection rod and tighten hand-tight.
10.
Place the intermediate plate on housing, in the position indicated by
the drawing line.
11.
Place the new valve plate on the intermediate plate.
12.
Place the head plate on the intermediate plate, in the position indicated
by the drawing line; gently tighten the four screws, evenly and
diagonally (if a torque screwdriver is available: torque about 0.30 Nm).
13.
Let the pump run.
Summary of Contents for 43iQ
Page 1: ...43iQ Instruction Manual Sulfur Dioxide Analyzer 117568 00 1Sep2021 ...
Page 2: ......
Page 8: ......
Page 18: ......
Page 34: ...Operation Instrument Display 3 8 43iQ Instruction Manual Thermo Scientific ...
Page 162: ......
Page 170: ......
Page 180: ......
Page 228: ......
Page 238: ......
Page 262: ......
Page 270: ......
Page 282: ......
Page 283: ......