![Thermo Scientific 410iQ Instruction Manual Download Page 26](http://html.mh-extra.com/html/thermo-scientific/410iq/410iq_instruction-manual_1105140026.webp)
Installation and Setup
Startup
2-8
410iQ Instruction Manual
Thermo Scientific
Use the following procedure when starting the instrument.
1.
Turn the power ON.
2.
Set the PURGE port input pressure to 10 psig.
3.
Allow 90–120 minutes for the instrument to stabilize. During the time
that the instrument is warming up, the mode “warm up” is displayed
on the gas mode button in the title bar, and the concentration
calculation is turned off. To disable warm up, go to
Settings>
Configuration
.
4.
Set instrument parameters such as operating ranges and averaging times
to their appropriate settings. For more information about instrument
parameters, see the “
Operation
” chapter.
5.
Before beginning the actual monitoring, perform a multipoint
calibration as described in the “
Calibration
” chapter.
Figure 2–7.
Front Panel and Touchscreen Display
Startup
Summary of Contents for 410iQ
Page 1: ...410iQ Instruction Manual Carbon Dioxide Analyzer 117081 00 1Apr2020 ...
Page 2: ......
Page 18: ......
Page 35: ...Operation Instrument Display Thermo Scientific 410iQ Instruction Manual 3 9 ...
Page 160: ......
Page 171: ...Calibration Calibration Thermo Scientific 410iQ Instruction Manual 4 11 ...
Page 188: ......
Page 264: ......
Page 284: ......
Page 304: ......
Page 305: ......