7.3 Chocolate spray nozzle maintenance
At the end of the working cycle each day, use the
dosing pump to pump warm water through the
chocolate feed pipe.
At regular intervals and whenever necessary,
dismantle the end of the chocolate spray nozzle (Pos.
1, Fig. 7.1) to restore it to proper functioning
condition.
Fig. 7.1
7.4 Doser maintenance
Periodically check the efficiency of the dosers.
Proceed as follows:
1 - Shut off the compressed air supply;
2 - Slacken the screws holding the doser retaining
bar;
3 - Remove the doser;
4 - Dismantle the doser:
- unscrew the bottom ring nut (Pos. 1, Fig.
7.2);
- open the clamp joining the lower and upper
parts (Pos. 2, Fig. 7.2);
- extract the doser piston shaft (Pos. 3, Fig.
7.2).
With the doser dismantled, check the efficiency
of the O-rings (Pos. 4-5, Fig. 7.2) on the stem.
If they are worn, ice cream will leak from the
top of the doser.
5 - Wash using the recommended products shown
in the table and reassemble.
Fig.7.2
1
2
3
4
5
1
2
3
4
5
Summary of Contents for COMET RC
Page 46: ...HOYER COMET RC CRC804BH 8 1 Tetra Pak Hoyer Contents 8 TROUBLESHOOTING 8 1 Troubleshooting 8 2...
Page 50: ...CRC804BI 9 3 Tetra Pak Hoyer Fig 9 2 STRUCTURE 1 2 2 2 LIST LAYOUT...
Page 63: ...CRC910BL 10 5 Tetra Pak Hoyer Fig 10 3 GAUGE 6 7 8 5 4 9 LIST LAYOUT...
Page 65: ...CRC910BL 10 7 Tetra Pak Hoyer Fig 10 4 SPRAY NOZZLE 4 2 1 3 LIST LAYOUT...
Page 71: ...CRC910BL 10 13 Tetra Pak Hoyer Fig 10 7 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 73: ...CRC910BL 10 15 Tetra Pak Hoyer Fig 10 8 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 75: ...CRC910BL 10 17 Tetra Pak Hoyer Fig 10 9 LID CLOSING 1 2 3 4 5 6 LIST LAYOUT...
Page 77: ...CRC910BL 10 19 Tetra Pak Hoyer Fig 10 10 EJECTOR 3 2 1 4 5 9 6 LIST LAYOUT...
Page 85: ...CRC910BL 10 27 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 10 5 Fig 10 14 VARIEGATOR LIST LAYOUT...
Page 92: ...CRC910BM 11 5 Tetra Pak Hoyer Fig 11 3 CHEWING GUM FEED 3 2 1 5 9 9 10 7 6 4 8 LIST LAYOUT...
Page 98: ...CRC910BM 11 11 Tetra Pak Hoyer Fig 11 6 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 100: ...CRC910BM 11 13 Tetra Pak Hoyer Fig 11 7 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 102: ...CRC910BM 11 15 Tetra Pak Hoyer Fig 11 8 LID CLOSING 1 2 3 LIST LAYOUT...
Page 104: ...CRC910BM 11 17 Tetra Pak Hoyer Fig 11 8a LID SEALING 1 2 4 6 8 10 3 5 7 9 LIST LAYOUT...
Page 106: ...CRC910BM 11 19 Tetra Pak Hoyer Fig 11 9 EJECTOR 8 7 5 7 8 4 2 3 1 9 6 11 2 9 6 LIST LAYOUT...
Page 108: ...CRC910BM 11 21 Tetra Pak Hoyer Fig 11 10 DATE STAMP 1 2 3 4 LIST LAYOUT...
Page 116: ...CRC910BM 11 29 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 11 4 Fig 11 14 VARIEGATOR LIST LAYOUT...