![Tetra Pak COMET RC Manual Download Page 20](http://html1.mh-extra.com/html/tetra-pak/comet-rc/comet-rc_manual_1092901020.webp)
CRC910B E
5-5
Tetra Pak
Hoyer
5.2.6 Topping/pencil filler station adjustment
Loosen the screws (Pos. 1/2, Fig. 5.7-5.7a) to
adjust topping/pencil filler height and centre it over
the slot, then tighten the screws again when finished.
Turn on the chocolate heater thirty minutes before
5.2.7 Granule station adjustment
Before beginning production, check that the hopper
and dosing channels are completely dry.
Also check that the dosing channels are centred over
starting production using the switch (Pos. 8, Fig. 5.17).
F
NOTE:
Make sure that there is water in the water jacket at
all times to prevent the heaters from burning.
Fig. 5.8
the slots, and if not, adjust the position of the station
by slackening the screws (Pos. 1, Fig. 5.7) on the
fixing blocks.
2
1
Fig. 5.6a
2
1
2
1
2
1
Fig. 5.7
Fig. 5.7a
Summary of Contents for COMET RC
Page 46: ...HOYER COMET RC CRC804BH 8 1 Tetra Pak Hoyer Contents 8 TROUBLESHOOTING 8 1 Troubleshooting 8 2...
Page 50: ...CRC804BI 9 3 Tetra Pak Hoyer Fig 9 2 STRUCTURE 1 2 2 2 LIST LAYOUT...
Page 63: ...CRC910BL 10 5 Tetra Pak Hoyer Fig 10 3 GAUGE 6 7 8 5 4 9 LIST LAYOUT...
Page 65: ...CRC910BL 10 7 Tetra Pak Hoyer Fig 10 4 SPRAY NOZZLE 4 2 1 3 LIST LAYOUT...
Page 71: ...CRC910BL 10 13 Tetra Pak Hoyer Fig 10 7 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 73: ...CRC910BL 10 15 Tetra Pak Hoyer Fig 10 8 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 75: ...CRC910BL 10 17 Tetra Pak Hoyer Fig 10 9 LID CLOSING 1 2 3 4 5 6 LIST LAYOUT...
Page 77: ...CRC910BL 10 19 Tetra Pak Hoyer Fig 10 10 EJECTOR 3 2 1 4 5 9 6 LIST LAYOUT...
Page 85: ...CRC910BL 10 27 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 10 5 Fig 10 14 VARIEGATOR LIST LAYOUT...
Page 92: ...CRC910BM 11 5 Tetra Pak Hoyer Fig 11 3 CHEWING GUM FEED 3 2 1 5 9 9 10 7 6 4 8 LIST LAYOUT...
Page 98: ...CRC910BM 11 11 Tetra Pak Hoyer Fig 11 6 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 100: ...CRC910BM 11 13 Tetra Pak Hoyer Fig 11 7 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 102: ...CRC910BM 11 15 Tetra Pak Hoyer Fig 11 8 LID CLOSING 1 2 3 LIST LAYOUT...
Page 104: ...CRC910BM 11 17 Tetra Pak Hoyer Fig 11 8a LID SEALING 1 2 4 6 8 10 3 5 7 9 LIST LAYOUT...
Page 106: ...CRC910BM 11 19 Tetra Pak Hoyer Fig 11 9 EJECTOR 8 7 5 7 8 4 2 3 1 9 6 11 2 9 6 LIST LAYOUT...
Page 108: ...CRC910BM 11 21 Tetra Pak Hoyer Fig 11 10 DATE STAMP 1 2 3 4 LIST LAYOUT...
Page 116: ...CRC910BM 11 29 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 11 4 Fig 11 14 VARIEGATOR LIST LAYOUT...