![Tetra Pak COMET RC Manual Download Page 23](http://html1.mh-extra.com/html/tetra-pak/comet-rc/comet-rc_manual_1092901023.webp)
CRC910BE
5-8
Tetra Pak
Hoyer
5.2.13 Cone ejector station adjustment
Adjust the positions of the ejector bends (Pos. 1,
Fig. 5.14) and the chute (Pos. 2, Fig. 5.14) so that
the cones do not interfere with these parts when
they are ejected.
The angle of the ejector bends (Pos. 1, Fig. 5.14)
can be adjusted by slackening the fixing screws (Pos.
3, Fig. 5.14) and correcting the positioning of the
cone on the chute.
Fig. 5.14
Fig. 5.15
5.2.14 Cup ejector station adjustment
Adjust the position of the ejector plates (Pos. 1,
Fig. 5.15) and chute (Pos. 2, Fig. 5.15) so that
when the cup is ejected it does not interfere with
these parts. If it does, slacken the fixing screws and
move the chute (Pos. 2, Fig. 5.15).
Check that the ejector plates (Pos. 1, Fig. 5.15)
push the cup onto the product conveyor chute (Pos.
2, Fig. 5.15).
5.2.12 Stamping station adjustment
The stamp is fixed to the raise/lower slide.
It can be centred over the lid by loosening the screw
(Pos. 1, Fig. 5.13); tighten the screw again when
finished.
Adjustment is important for correct stamping.
Fig. 5.13
2
1
1
2
3
1
2
Summary of Contents for COMET RC
Page 46: ...HOYER COMET RC CRC804BH 8 1 Tetra Pak Hoyer Contents 8 TROUBLESHOOTING 8 1 Troubleshooting 8 2...
Page 50: ...CRC804BI 9 3 Tetra Pak Hoyer Fig 9 2 STRUCTURE 1 2 2 2 LIST LAYOUT...
Page 63: ...CRC910BL 10 5 Tetra Pak Hoyer Fig 10 3 GAUGE 6 7 8 5 4 9 LIST LAYOUT...
Page 65: ...CRC910BL 10 7 Tetra Pak Hoyer Fig 10 4 SPRAY NOZZLE 4 2 1 3 LIST LAYOUT...
Page 71: ...CRC910BL 10 13 Tetra Pak Hoyer Fig 10 7 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 73: ...CRC910BL 10 15 Tetra Pak Hoyer Fig 10 8 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 75: ...CRC910BL 10 17 Tetra Pak Hoyer Fig 10 9 LID CLOSING 1 2 3 4 5 6 LIST LAYOUT...
Page 77: ...CRC910BL 10 19 Tetra Pak Hoyer Fig 10 10 EJECTOR 3 2 1 4 5 9 6 LIST LAYOUT...
Page 85: ...CRC910BL 10 27 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 10 5 Fig 10 14 VARIEGATOR LIST LAYOUT...
Page 92: ...CRC910BM 11 5 Tetra Pak Hoyer Fig 11 3 CHEWING GUM FEED 3 2 1 5 9 9 10 7 6 4 8 LIST LAYOUT...
Page 98: ...CRC910BM 11 11 Tetra Pak Hoyer Fig 11 6 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 100: ...CRC910BM 11 13 Tetra Pak Hoyer Fig 11 7 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 102: ...CRC910BM 11 15 Tetra Pak Hoyer Fig 11 8 LID CLOSING 1 2 3 LIST LAYOUT...
Page 104: ...CRC910BM 11 17 Tetra Pak Hoyer Fig 11 8a LID SEALING 1 2 4 6 8 10 3 5 7 9 LIST LAYOUT...
Page 106: ...CRC910BM 11 19 Tetra Pak Hoyer Fig 11 9 EJECTOR 8 7 5 7 8 4 2 3 1 9 6 11 2 9 6 LIST LAYOUT...
Page 108: ...CRC910BM 11 21 Tetra Pak Hoyer Fig 11 10 DATE STAMP 1 2 3 4 LIST LAYOUT...
Page 116: ...CRC910BM 11 29 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 11 4 Fig 11 14 VARIEGATOR LIST LAYOUT...