![Tetra Pak COMET RC Manual Download Page 15](http://html1.mh-extra.com/html/tetra-pak/comet-rc/comet-rc_manual_1092901015.webp)
CRC804BD
4-3
Tetra Pak
Hoyer
Fig. 4.3
4.3 Transport and installation
4.3 Functional checks
Before starting up the machine, perform the following
control procedures:
a. Check that the emergency button is released
(Pos. 3, Fig. 4.3).
b. Turn on the main power switch (Pos. 6, Fig.
4.3).
c. Turn the switch (Pos. 4, Fig. 4.3) to start the
motor. Check that the table turns in the correct
direction (Pos. 5, Fig. 4.3). If not, invert the
phases.
Fig. 4.2
MODEL
SERIAL N.:
YEAR OF CONSTRUCTION:
ELECTRICAL SUPPLY:
PNEUMATIC SUPPLY:
REFRIGERANT:
HEATING GAS:
THERMAL CAPACITY:
kW
Kg.
Kcal/h
Via Monferrato, 52 - 20098 San Giuliano Milanese
( MI ) Italia - Tel. 02-982921 - Fax 02-9880171
Made in Italy
Tetra Pak
Hoyer
V
bar
Nlt/min.
ph
Hz
Type
1
4
3
1
5
6
F
F
F
The machine is assembled on wheels (Pos. 1, Fig.
4.3) so that it is easy for the operator to push it into
place.
a. Put the machine in position in the production
area, checking that there is sufficient space to
allow removal of the guards and ease of access
to internal machine parts.
b. Check the data shown on the plate to make sure
that the machine is compatible with the factory
power supply (Fig. 4.2).
c. The machine’s components are protected
electrically against short circuits (with
appropriate safety devices). Connect up the
electrical cable down-line of a master switch with
thermal overload cutout and ultrarapid fuses of
adequate amperage or an automatic
magnetothermal circuit breaker of adequate size.
d. Connect the compressed air supply to the
manifold and check that the pressure reducer is
set to 6 bar.
IMPORTANT:
Connections must be made only by skilled
technicians familiar with accident prevention
legislation.
Summary of Contents for COMET RC
Page 46: ...HOYER COMET RC CRC804BH 8 1 Tetra Pak Hoyer Contents 8 TROUBLESHOOTING 8 1 Troubleshooting 8 2...
Page 50: ...CRC804BI 9 3 Tetra Pak Hoyer Fig 9 2 STRUCTURE 1 2 2 2 LIST LAYOUT...
Page 63: ...CRC910BL 10 5 Tetra Pak Hoyer Fig 10 3 GAUGE 6 7 8 5 4 9 LIST LAYOUT...
Page 65: ...CRC910BL 10 7 Tetra Pak Hoyer Fig 10 4 SPRAY NOZZLE 4 2 1 3 LIST LAYOUT...
Page 71: ...CRC910BL 10 13 Tetra Pak Hoyer Fig 10 7 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 73: ...CRC910BL 10 15 Tetra Pak Hoyer Fig 10 8 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 75: ...CRC910BL 10 17 Tetra Pak Hoyer Fig 10 9 LID CLOSING 1 2 3 4 5 6 LIST LAYOUT...
Page 77: ...CRC910BL 10 19 Tetra Pak Hoyer Fig 10 10 EJECTOR 3 2 1 4 5 9 6 LIST LAYOUT...
Page 85: ...CRC910BL 10 27 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 10 5 Fig 10 14 VARIEGATOR LIST LAYOUT...
Page 92: ...CRC910BM 11 5 Tetra Pak Hoyer Fig 11 3 CHEWING GUM FEED 3 2 1 5 9 9 10 7 6 4 8 LIST LAYOUT...
Page 98: ...CRC910BM 11 11 Tetra Pak Hoyer Fig 11 6 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 100: ...CRC910BM 11 13 Tetra Pak Hoyer Fig 11 7 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 102: ...CRC910BM 11 15 Tetra Pak Hoyer Fig 11 8 LID CLOSING 1 2 3 LIST LAYOUT...
Page 104: ...CRC910BM 11 17 Tetra Pak Hoyer Fig 11 8a LID SEALING 1 2 4 6 8 10 3 5 7 9 LIST LAYOUT...
Page 106: ...CRC910BM 11 19 Tetra Pak Hoyer Fig 11 9 EJECTOR 8 7 5 7 8 4 2 3 1 9 6 11 2 9 6 LIST LAYOUT...
Page 108: ...CRC910BM 11 21 Tetra Pak Hoyer Fig 11 10 DATE STAMP 1 2 3 4 LIST LAYOUT...
Page 116: ...CRC910BM 11 29 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 11 4 Fig 11 14 VARIEGATOR LIST LAYOUT...