![Tetra Pak COMET RC Manual Download Page 21](http://html1.mh-extra.com/html/tetra-pak/comet-rc/comet-rc_manual_1092901021.webp)
CRC910BE
5-6
Tetra Pak
Hoyer
5.2.8 Lid feed station adjustment
5.2.9 Cone lid closing station adjustment
Make sure that the lid feed station is switched off
(Pos. 15, Fig. 5.17) with the suction cups in the
raised position.
Check that the suction cups (Pos. 1, Fig. 5.9) are
in direct contact with the lids in the magazines. Adjust
height and centring over the slot by loosening the
screws (Pos. 1/2, Fig. 5.9) so as to raise the suction
cups (Pos. 1, Fig. 5.9) so that they are in direct
contact with the lids.
Tighten the screws (Pos. 1/2, Fig. 5.9) when
finished.
With the machine at its slowest speed, check that
when the lid feed station is activated, the suction
cup mounting shaft drops down immediately after
the slotted disk has stopped, and then check that it
moves back up before the slotted disk is translated
again.
Check that the crimper (Pos. 1, Fig. 5.9) rests on
the outside of the slot (Pos. 2, Fig. 5.10) and
compresses the inner part of the lid in order to close
off the cone perfectly. Loosen the screws (Pos. 3/
Fig. 5.9
Fig. 5.10
4, Fig. 5.10) to adjust crimper height and centre it
over the slots, tightening the screws again when
finished.
2
1
3
3
1
4
2
Summary of Contents for COMET RC
Page 46: ...HOYER COMET RC CRC804BH 8 1 Tetra Pak Hoyer Contents 8 TROUBLESHOOTING 8 1 Troubleshooting 8 2...
Page 50: ...CRC804BI 9 3 Tetra Pak Hoyer Fig 9 2 STRUCTURE 1 2 2 2 LIST LAYOUT...
Page 63: ...CRC910BL 10 5 Tetra Pak Hoyer Fig 10 3 GAUGE 6 7 8 5 4 9 LIST LAYOUT...
Page 65: ...CRC910BL 10 7 Tetra Pak Hoyer Fig 10 4 SPRAY NOZZLE 4 2 1 3 LIST LAYOUT...
Page 71: ...CRC910BL 10 13 Tetra Pak Hoyer Fig 10 7 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 73: ...CRC910BL 10 15 Tetra Pak Hoyer Fig 10 8 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 75: ...CRC910BL 10 17 Tetra Pak Hoyer Fig 10 9 LID CLOSING 1 2 3 4 5 6 LIST LAYOUT...
Page 77: ...CRC910BL 10 19 Tetra Pak Hoyer Fig 10 10 EJECTOR 3 2 1 4 5 9 6 LIST LAYOUT...
Page 85: ...CRC910BL 10 27 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 10 5 Fig 10 14 VARIEGATOR LIST LAYOUT...
Page 92: ...CRC910BM 11 5 Tetra Pak Hoyer Fig 11 3 CHEWING GUM FEED 3 2 1 5 9 9 10 7 6 4 8 LIST LAYOUT...
Page 98: ...CRC910BM 11 11 Tetra Pak Hoyer Fig 11 6 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 100: ...CRC910BM 11 13 Tetra Pak Hoyer Fig 11 7 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 102: ...CRC910BM 11 15 Tetra Pak Hoyer Fig 11 8 LID CLOSING 1 2 3 LIST LAYOUT...
Page 104: ...CRC910BM 11 17 Tetra Pak Hoyer Fig 11 8a LID SEALING 1 2 4 6 8 10 3 5 7 9 LIST LAYOUT...
Page 106: ...CRC910BM 11 19 Tetra Pak Hoyer Fig 11 9 EJECTOR 8 7 5 7 8 4 2 3 1 9 6 11 2 9 6 LIST LAYOUT...
Page 108: ...CRC910BM 11 21 Tetra Pak Hoyer Fig 11 10 DATE STAMP 1 2 3 4 LIST LAYOUT...
Page 116: ...CRC910BM 11 29 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 11 4 Fig 11 14 VARIEGATOR LIST LAYOUT...