CRC910B E
5-7
Tetra Pak
Hoyer
5.2.10 Cup lid closing station adjustment
Check that the lid pressing plate (Pos. 1, Fig. 5.11)
presses the lid in the cup in such a manner that it
closes off the cup perfectly (Pos. 2, Fig. 5.11). If it
is not closed off correctly, adjust plate height and
centre it over the slot by loosening the screws (Pos.
3/4, Fig. 5.11), remembering to tighten them again
afterwards.
Fig. 5.11
5.2.11 Lid sealing station adjustment
The sealing head is fixed to the raise/lower slide. It
can be centred over the lid by loosening the screw
(Pos. 1, Fig. 5.12); tighten the screw again when
finished.
Adjustment is important for correct sealing.
A control (Pos. 4, Fig. 5.17) on the operator
control panel may be used to adjust the temperatu-
re of the sealing head (press “F” and then press + to
increase temperature or – to decrease it).
Fig. 5.12
3
1
4
2
1
Summary of Contents for COMET RC
Page 46: ...HOYER COMET RC CRC804BH 8 1 Tetra Pak Hoyer Contents 8 TROUBLESHOOTING 8 1 Troubleshooting 8 2...
Page 50: ...CRC804BI 9 3 Tetra Pak Hoyer Fig 9 2 STRUCTURE 1 2 2 2 LIST LAYOUT...
Page 63: ...CRC910BL 10 5 Tetra Pak Hoyer Fig 10 3 GAUGE 6 7 8 5 4 9 LIST LAYOUT...
Page 65: ...CRC910BL 10 7 Tetra Pak Hoyer Fig 10 4 SPRAY NOZZLE 4 2 1 3 LIST LAYOUT...
Page 71: ...CRC910BL 10 13 Tetra Pak Hoyer Fig 10 7 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 73: ...CRC910BL 10 15 Tetra Pak Hoyer Fig 10 8 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 75: ...CRC910BL 10 17 Tetra Pak Hoyer Fig 10 9 LID CLOSING 1 2 3 4 5 6 LIST LAYOUT...
Page 77: ...CRC910BL 10 19 Tetra Pak Hoyer Fig 10 10 EJECTOR 3 2 1 4 5 9 6 LIST LAYOUT...
Page 85: ...CRC910BL 10 27 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 10 5 Fig 10 14 VARIEGATOR LIST LAYOUT...
Page 92: ...CRC910BM 11 5 Tetra Pak Hoyer Fig 11 3 CHEWING GUM FEED 3 2 1 5 9 9 10 7 6 4 8 LIST LAYOUT...
Page 98: ...CRC910BM 11 11 Tetra Pak Hoyer Fig 11 6 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 100: ...CRC910BM 11 13 Tetra Pak Hoyer Fig 11 7 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 102: ...CRC910BM 11 15 Tetra Pak Hoyer Fig 11 8 LID CLOSING 1 2 3 LIST LAYOUT...
Page 104: ...CRC910BM 11 17 Tetra Pak Hoyer Fig 11 8a LID SEALING 1 2 4 6 8 10 3 5 7 9 LIST LAYOUT...
Page 106: ...CRC910BM 11 19 Tetra Pak Hoyer Fig 11 9 EJECTOR 8 7 5 7 8 4 2 3 1 9 6 11 2 9 6 LIST LAYOUT...
Page 108: ...CRC910BM 11 21 Tetra Pak Hoyer Fig 11 10 DATE STAMP 1 2 3 4 LIST LAYOUT...
Page 116: ...CRC910BM 11 29 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 11 4 Fig 11 14 VARIEGATOR LIST LAYOUT...