![Tetra Pak COMET RC Manual Download Page 28](http://html1.mh-extra.com/html/tetra-pak/comet-rc/comet-rc_manual_1092901028.webp)
CRC804BF
6-3
Tetra Pak
Hoyer
6.2 Cone production equipment
6.2.1 Cone feed station
The function of the cone feeders (Fig. 6.2) mounted
at the end of the machine is to deposit the cones in
the slots in the lamellas. This action is synchronised
with the movement of the trays.
The cone feeder consists of a magazine (Pos. 1,
Fig. 6.2) in which cones must be placed manually,
and a cone dispenser driver by pneumatic actuators.
The station is activated by the cone feed switch (Pos.
11, Fig. 6.11) on the control panel.
6.2.2 Gauge station
The gauge is fixed on the up/down slide. Loosen
the screws (Pos. 1/2, Fig. 6.3) to adjust its height
and centred it over the slots, tightening the screws
again afterwards.
Fig. 6.3
6.2.3 Chocolate spray station
The sprayer is fixed on the up/down slide. Loosen
the screws (Pos. 1/2, Fig. 6.4) to adjust its height
and centred it over the slots, tightening the screws
again afterwards.
Its travel must be adjusted to control the entry of
the chocolate spray nozzle into the cone.
The station is turned on using the cone feed switch
(Pos. 13, Fig. 6.11) on the control panel.
Fig. 6.4
2
1
3
2
1
3
Summary of Contents for COMET RC
Page 46: ...HOYER COMET RC CRC804BH 8 1 Tetra Pak Hoyer Contents 8 TROUBLESHOOTING 8 1 Troubleshooting 8 2...
Page 50: ...CRC804BI 9 3 Tetra Pak Hoyer Fig 9 2 STRUCTURE 1 2 2 2 LIST LAYOUT...
Page 63: ...CRC910BL 10 5 Tetra Pak Hoyer Fig 10 3 GAUGE 6 7 8 5 4 9 LIST LAYOUT...
Page 65: ...CRC910BL 10 7 Tetra Pak Hoyer Fig 10 4 SPRAY NOZZLE 4 2 1 3 LIST LAYOUT...
Page 71: ...CRC910BL 10 13 Tetra Pak Hoyer Fig 10 7 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 73: ...CRC910BL 10 15 Tetra Pak Hoyer Fig 10 8 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 75: ...CRC910BL 10 17 Tetra Pak Hoyer Fig 10 9 LID CLOSING 1 2 3 4 5 6 LIST LAYOUT...
Page 77: ...CRC910BL 10 19 Tetra Pak Hoyer Fig 10 10 EJECTOR 3 2 1 4 5 9 6 LIST LAYOUT...
Page 85: ...CRC910BL 10 27 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 10 5 Fig 10 14 VARIEGATOR LIST LAYOUT...
Page 92: ...CRC910BM 11 5 Tetra Pak Hoyer Fig 11 3 CHEWING GUM FEED 3 2 1 5 9 9 10 7 6 4 8 LIST LAYOUT...
Page 98: ...CRC910BM 11 11 Tetra Pak Hoyer Fig 11 6 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 100: ...CRC910BM 11 13 Tetra Pak Hoyer Fig 11 7 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 102: ...CRC910BM 11 15 Tetra Pak Hoyer Fig 11 8 LID CLOSING 1 2 3 LIST LAYOUT...
Page 104: ...CRC910BM 11 17 Tetra Pak Hoyer Fig 11 8a LID SEALING 1 2 4 6 8 10 3 5 7 9 LIST LAYOUT...
Page 106: ...CRC910BM 11 19 Tetra Pak Hoyer Fig 11 9 EJECTOR 8 7 5 7 8 4 2 3 1 9 6 11 2 9 6 LIST LAYOUT...
Page 108: ...CRC910BM 11 21 Tetra Pak Hoyer Fig 11 10 DATE STAMP 1 2 3 4 LIST LAYOUT...
Page 116: ...CRC910BM 11 29 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 11 4 Fig 11 14 VARIEGATOR LIST LAYOUT...