![Tetra Pak COMET RC Manual Download Page 17](http://html1.mh-extra.com/html/tetra-pak/comet-rc/comet-rc_manual_1092901017.webp)
CRC910BE
5-2
Tetra Pak
Hoyer
The HOYER COMET RC CONE – CUP machine
fills and seals containers (cones and cups).
It can produce cones and cups up to 100 mm in
diameter.
Standard cone production involves use of the
following stations:
-
cone feed (Pos. 1, Fig. 5.1);
-
gauge (Pos. 3, Fig. 5.1);
-
chocolate spray (Pos. 4, Fig. 5.1);
-
station for dosing ice cream or ice cream mixes
(Pos. 5, Fig. 5.1) in one or two flavours;
-
topping (Pos. 6, Fig. 5.1);
-
granule (Pos. 7, Fig. 5.1);
-
lid feed (Pos. 8, Fig. 5.1);
-
lid closure (pos. 9, Fig. 5.1);
-
product ejector (Pos. 10, Fig. 5.1).
Standard cup production involves the use of the
following stations:
-
cup feed (Pos. 2, Fig. 5.1);
-
station for dosing ice cream or ice cream mixes
(Pos. 5, Fig. 5.1) in one or two flavours;
5.1 Product changeover
-
lid feed (Pos. 8, Fig. 5.1);
-
lid closure (pos. 9, Fig. 5.1);
-
product ejector (Pos. 10, Fig. 5.1).
When changing to a cone format of a different size,
it is necessary to replace the slot set, cone feed
magazines, gauging pads, lid feed magazines, and
crimpers.
When changing format from cones to cups, it is
necessary to replace the slot set, assembled the cup
feed with its suction cup holders in place, replace
the lid feed magazines, replace the cone lid crimpers
with lid presses, and replace the cone ejector (Pos.
10, Fig. 5.1) with the cup ejector (Pos. 11, Fig.
5.1), replacing the expulsion plates.
F
NOTE:
If the machine is set up for cone and cup production,
the topping and granule stations may be used to de-
corate standard cups.
Fig. 5.1
Fig. 5.2
3
8
5
4
1
2
7
9
10
6
1
2
Summary of Contents for COMET RC
Page 46: ...HOYER COMET RC CRC804BH 8 1 Tetra Pak Hoyer Contents 8 TROUBLESHOOTING 8 1 Troubleshooting 8 2...
Page 50: ...CRC804BI 9 3 Tetra Pak Hoyer Fig 9 2 STRUCTURE 1 2 2 2 LIST LAYOUT...
Page 63: ...CRC910BL 10 5 Tetra Pak Hoyer Fig 10 3 GAUGE 6 7 8 5 4 9 LIST LAYOUT...
Page 65: ...CRC910BL 10 7 Tetra Pak Hoyer Fig 10 4 SPRAY NOZZLE 4 2 1 3 LIST LAYOUT...
Page 71: ...CRC910BL 10 13 Tetra Pak Hoyer Fig 10 7 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 73: ...CRC910BL 10 15 Tetra Pak Hoyer Fig 10 8 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 75: ...CRC910BL 10 17 Tetra Pak Hoyer Fig 10 9 LID CLOSING 1 2 3 4 5 6 LIST LAYOUT...
Page 77: ...CRC910BL 10 19 Tetra Pak Hoyer Fig 10 10 EJECTOR 3 2 1 4 5 9 6 LIST LAYOUT...
Page 85: ...CRC910BL 10 27 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 10 5 Fig 10 14 VARIEGATOR LIST LAYOUT...
Page 92: ...CRC910BM 11 5 Tetra Pak Hoyer Fig 11 3 CHEWING GUM FEED 3 2 1 5 9 9 10 7 6 4 8 LIST LAYOUT...
Page 98: ...CRC910BM 11 11 Tetra Pak Hoyer Fig 11 6 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 100: ...CRC910BM 11 13 Tetra Pak Hoyer Fig 11 7 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 102: ...CRC910BM 11 15 Tetra Pak Hoyer Fig 11 8 LID CLOSING 1 2 3 LIST LAYOUT...
Page 104: ...CRC910BM 11 17 Tetra Pak Hoyer Fig 11 8a LID SEALING 1 2 4 6 8 10 3 5 7 9 LIST LAYOUT...
Page 106: ...CRC910BM 11 19 Tetra Pak Hoyer Fig 11 9 EJECTOR 8 7 5 7 8 4 2 3 1 9 6 11 2 9 6 LIST LAYOUT...
Page 108: ...CRC910BM 11 21 Tetra Pak Hoyer Fig 11 10 DATE STAMP 1 2 3 4 LIST LAYOUT...
Page 116: ...CRC910BM 11 29 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 11 4 Fig 11 14 VARIEGATOR LIST LAYOUT...