Service and Repair Manual
July 2021
Boom Components
36
S
®
-60 DC • S
®
-60 FE
Part No. 1299608GT
13 Remove the boom lower pivot pin retaining
fasteners. Use a soft metal drift to remove the
pin.
14 Remove the boom upper pivot pin retaining
fasteners. Use a soft metal drift to remove the
pin. Remove the boom from the machine.
15 Using an overhead lifting device, support one
of the pivot levers.
16 Using a soft metal drift, push the pivot pin in
far enough that it can be lowered onto the
boom structure.
Crushing hazard. The pivot lever
could fall if not properly
supported.
17 Using an overhead lifting device, support the
other pivot lever.
18 Using a soft metal drift, finish removing the
pivot pin.
Note: Do not remove the metal drift. Only pull it
back far enough to lower the pivot lever.
Crushing hazard. The timing
link will fall if the metal drift is
removed before it has been
properly supported.
19 Using an overhead lifting device, support the
timing link.
20 Remove the metal drift and lower the timing
link onto the mid-pivot of the boom structure.
21 Using a soft metal drift, remove the pivot pin
securing the boom to the mid-pivot.
Crushing hazard. The boom
assembly will fall if not properly
supported when removed from
the machine.
22 Remove the boom from the machine.
4-3
Boom Lift Cylinder
The primary boom lift cylinder raises and lowers
the primary boom. The primary boom lift cylinder is
equipped with a counterbalance valve to prevent
movement in the event of a hydraulic line failure.
How to Remove the Boom Lift
Cylinder
Bodily injury hazard. This
procedure requires specific repair
skills, lifting equipment and a
suitable workshop. Attempting
this procedure without these
skills and tools could result in
death or serious injury and
significant component damage.
Dealer service is strongly
recommended.
Note: When removing a hose assembly or fitting,
the O-ring (if equipped) on the fitting and/or hose
end must be replaced. All connections must be
torqued to specification during installation. Refer to
Specifications,
Hydraulic Hose and Fitting Torque
Specifications.
1 Raise the boom until the lift cylinder rod-end
pivot pin is above the side covers.
2 Attach a 5 ton / 5000 kg overhead supporting
device to the platform end of the boom for
support. Do not apply any lifting pressure.
3 Attach a 5 ton / 5000 kg overhead supporting
device to the two lifting eyes located at the top
of the mid-pivot. Do not apply any lifting
pressure.
Summary of Contents for Genie S-60 DC
Page 151: ...July 2021 Service and Repair Manual 139 Electrical Schematic DC FE Models ...
Page 154: ...Service and Repair Manual July 2021 142 Electrical Schematic Ground Control Box ...
Page 155: ...July 2021 Service and Repair Manual 143 Electrical Schematic Turntable Controller ...
Page 158: ...Service and Repair Manual July 2021 146 Electrical Schematic Platform Control Box ...
Page 159: ...July 2021 Service and Repair Manual 147 Electrical Schematic Kubota D1105 ...
Page 162: ...Service and Repair Manual July 2021 150 CAN BUS Wiring Diagram ...
Page 163: ...July 2021 Service and Repair Manual 151 Power Cable Wiring Diagram ...
Page 165: ...July 2021 Service and Repair Manual 153 Wiring Diagram AC Power Options ...
Page 168: ...Service and Repair Manual July 2021 156 Wiring Diagram RCBO Options ...
Page 169: ...July 2021 Service and Repair Manual 157 Hydraulic Schematic DC FE Models ...
Page 171: ......