FINNFLASH 1000
8
4 Locating and fastening
4.1 Planning the location
Plan and prepare carefully the location of the frame before fastening. Th
e following aspects should be consi-
dered when choosing the location:
• Accessibility to pathways, such as trays and shelves
• Floor loading: the weight of the equipped frame can exceed 300 kg
4.2 Fastening to floor
Fasten the frame to the fl oor with 4 screws at each corner of the bottom.
Required components: 4 pcs of M8 screw with washers (not included in the delivery)