FINNFLASH 1000
42
9 ADC FibreGuide
®
system
Th
e number of patch cords between the FINNFLASH 1000 frames and between the FINNFLASH 1000 frames
and equipment racks may be very high and may also be increased aft er the initial installation. Th
erefore the
management and protection of the patch cords is very important already in the initial stage of the installations
in the distributor space.
Teletekno highly recommends ADC FiberGuide® -pathway and protection system to be used in patch
cord installations between the FINNFLASH 1000 frames and between the FINNFLASH 1000 frames and
equipment racks.
Brief installation instructions are given in 9.1….9.6 of this document. Also some examples of implementations
are given.
Ask further information from Teletekno.
9.1 Preparation
• Prepare an installation plan, if not already completed.
• Secure all required tools.
• Open all shipping cartons to verify that correct catalogue numbers and quantities were
received.
• Unpack all items carefully and organize them into four groups corresponding to the main steps in
installation:
o Supports
o Horizontal
components
o Vertical
components
o End caps and other accessories
• Walk through the complete installation to verify routing of FiberGuide system against installation
drawing. Make changes or adjustments to the drawing as necessary.
• Contact the supplier if additional parts are required because of damages, shortages, or adjustments
to the installation plan.