
4250 Flow Meter
Section 4 Options and Accessories
4-9
CAUTION
Always protect your equipment by observing anti-static precau-
t i o n s w h e n ex p o s i n g i n t e r n a l c o m p o n e n t s . Tu r n t o
Section 5.7.1 for recommended precautions.
1. Remove the four Phillips screws on the front panel. Care-
fully pull the panel away from the case to access the inte-
rior.
2. Remove the lower metal shield by sliding it downward,
freeing the tabs from their slots.
This exposes the power supply PCB.
Figure 4-2 Flow meter with front panel removed
Lower shield
Summary of Contents for 4250
Page 2: ......
Page 4: ......
Page 12: ...4250 Flow Meter Table of Contents x ...
Page 28: ...4250 Flow Meter Section 1 Introduction 1 16 ...
Page 90: ...4250 Flow Meter Section 2 Programming 2 62 ...
Page 140: ...4250 Flow Meter Section 4 Options and Accessories 4 30 ...
Page 160: ...4250 Flow Meter Appendix A Replacement Parts and Accessories A 2 ...
Page 161: ...4250 Flow Meter Appendix A Replacement Parts and Accessories A 3 ...
Page 166: ...4250 Flow Meter Appendix A Replacement Parts and Accessories A 8 ...
Page 184: ...4250 Flow Meter Appendix C General Safety Procedures C 10 ...
Page 191: ...4250 Flow Meter Appendix D Material Safety Data Sheets D 7 ...
Page 192: ...4250 Flow Meter Appendix D Material Safety Data Sheets D 8 ...
Page 196: ......
Page 198: ......
Page 200: ......
Page 202: ...Warranty ...
Page 204: ......