Brief Procedures
TDS 410, 420 & TDS 460 Service Manual (Company Confidential Final Draft)
4Ć9
b.
Initialize the oscilloscope:
H
Press save/recall SETUP.
H
Press the main-menu button Recall Factory Setup; then press
the side-menu button OK Confirm Factory Init.
c.
Modify default settings:
H
Press AUTOSET
to obtain a viewable, triggered display.
H
Set the horizontal SCALE to 200
m
s.
H
Press VERTICAL MENU.
H
Press the main-menu button Bandwidth. Then press the side-
menu button 20 MHz.
H
Press CLEAR MENU to remove the vertical menu from the
screen.
2.
Verify that the time base operates: Confirm the following statements.
a.
One period of the square-wave probe-compensation signal is about
five horizontal divisions on-screen for the 200
m
s horizontal scale
setting (set in step 1c).
b.
Rotating the horizontal SCALE knob clockwise expands the wave-
form on-screen (more horizontal divisions per waveform period), and
that counterclockwise rotation contracts it, and that returning the
horizontal scale to 200
m
s returns the period to about five divisions.
c.
The horizontal POSITION knob positions the signal left and right
on-screen when rotated.
3.
Remove the test hookup: Disconnect the probe from the channel input
and the probe-adjust terminal.
Verify the Main and Delayed Trigger Systems
Equipment Required:
One P6138 probe.
Prerequisites:
None.
Procedure:
1.
Install the test hookup and preset the oscilloscope controls:
a.
Hook up the signal source: Install the probe on CH 1. Connect the
probe tip to PROBE ADJ on the front panel; leave the probe ground
unconnected. (See Figure 4-3 on page 4-7.)
b.
Initialize the oscilloscope:
H
Press save/recall SETUP.
H
Press the main-menu button Recall Factory Setup.
H
Press the side-menu button OK Confirm Factory Init.
c.
Modify default settings:
Summary of Contents for 410
Page 9: ...Contents x ...
Page 13: ...Contents xx ...
Page 19: ...Safety Summary xx ...
Page 25: ...Introduction x x ...
Page 26: ...Specifications ...
Page 47: ...Operating Information ...
Page 63: ...Operating Information Operating Information 2Ć16 ...
Page 64: ...Theory of Operation ...
Page 68: ...Circuit Description Theory of Operation 3Ć4 ...
Page 69: ...Performance Verification ...
Page 81: ...Brief Procedures Performance Verification 4Ć12 ...
Page 119: ...Performance Tests Performance Verification 4Ć50 ...
Page 120: ...Adjustment Procedures ...
Page 147: ...Maintenance ...
Page 151: ...Maintenance Information Maintenance 6Ć4 ...
Page 240: ...Options ...
Page 249: ...Electrical Parts List ...
Page 251: ...Replaceable Electrical Parts List Electrical Parts List 8Ć2 ...
Page 252: ...Diagrams ...
Page 258: ...Diagrams 9Ć6 ...
Page 259: ...Mechanical Parts List ...
Page 263: ...Mechanical Parts List 10Ć4 ...
Page 275: ...Mechanical Parts List 10Ć16 ...