169
/
188
c.Then grasp the end of the side cover with your hand, and
press the arrow Pull out in the direction (from back to front)
until the 5 mushrooms (in the green circle) on the side cover
are pulled out, and then take out the side cover.
d. Use 4# inner hexagon to remove the 2 M6×14 bolts on
the front of the tail skirt, and then use 4# inner hexagon to
remove the 2 swell nails under the tail skirt.
e. Use 4# inner hexagon to remove the 2 swell nails inside
the tail skirt and next to the rear taillight (marked by the
green circle).
f. Press down the part where the front part of the tail skirt
is in contact with the right part of the fuel tank cover
(golden), and pull the right part (golden) of the fuel tank
cover with one hand until the front of the tail skirt is pulled
out; then hold the middle part of the fuel tank with the other
hand Press the cover (blue) down, grab the front part of the
tail skirt with one hand and pull up until the front part of the
tail skirt is separated from the middle cover (blue) of the fuel
tank; hold the rear part of the tail skirt (green mark) with the
last hand, Grab the front of the tail skirt with one hand and
take it out in the direction of the arrow.
g. Refer to steps a-j in the steps of "Removing the spark
plug" to remove the left and right pedals and the left and
right trim cover components.
h. Pull down the connecting part of the surrounding
bottom plate and the middle of the surrounding (cyan) with
one hand, grasp the rear part of the surrounding bottom
(green mark) and pull it in the direction of the arrow until the
surrounding bottom is removed.
3. Put the coolant and pull out the
connection plug
a. Place suitable utensils under the big arrow, use water
clamp pliers to remove the green hoop pointed by the big
arrow, pull out the engine water inlet pipe, and let out the
coolant; then use a single batch to remove the clamp pointed
by the small arrow and pull it out The inlet pipe of the small
water tank discharges the coolant.
Summary of Contents for Zontes ZT125-M 2022
Page 1: ...1 188 ZT125 310T M Maintenance Manual 2022 09 14 ...
Page 91: ...91 188 l So far the adjustment operation of the valve clearance is completed ...
Page 115: ...115 188 Electrical schematic diagram of EFI system ...
Page 156: ...156 188 Exploded view of front fork components M125 310 Directional exploded view ...
Page 173: ...173 188 ...