TALEX Sp. z o.o.
ul. Dworcowa 9C
77-141 Borzytuchom
tel. +48 59 821 13 40
e-mail.
User manual
OptiCUT disc mower
Page
34
of
59
6.5 Post–season maintenance
Maintenance covers all activities listed in the section: Post-operation maintenance. In addition,
the machine should be stored under a roof, on a flat, hardened surface with a support. Check
the sealing paint. If you notice any damage to the paint, clean the area and fill it in with a new
layer of sealing paint.
In case of leakage of hydraulic system, it is essential to replace damaged
parts and units of hydraulic system to prevent environmental
contamination.
Hydraulic hoses, regardless of the external condition must
be replaced after a period of 5 years.
6.6 Environment and disposal
In case of a complete wear of machine to extent where it is impossible to operate the
machine any more, it should be disposed off. It also concerns current repairs and
replacement of damaged parts. For that purpose the machine should be completely cleaned.
The oil should be drained and utilized. Next, the machine should be dismantled, segregating
the parts in accordance to the use materials. The segregated parts should be delivered to a
waste collection or utilization place.
The machine is fully environment friendly. The materials used for its production are in 97%
recyclable. The used parts should be utilized in accordance with the local environmental
regulations. Throughout the entire period of operating the machine, be careful to prevent
any oil leaking, which could contaminate the environment.