TA I
NSTRUMENTS
TMA 2940
2–1
CHAPTER 2: Installing the
TMA 2940
Unpacking/Repacking the TMA 2940 ........ 2-3
Unpacking the TMA ............................ 2-3
Removing the Shipping Material ......... 2-6
Repacking the 2940 .............................. 2-8
Installing the Instrument ............................. 2-9
Inspecting the System ........................... 2-9
Choosing a Location .......................... 2-10
Installing the Thermocouple .............. 2-11
Installing the Weight Tray Door ........ 2-13
Installing the Stage ............................. 2-14
Installing the Expansion/
Penetration Probes .............................. 2-18
Installing a Probe ......................... 2-18
Removing a Probe ........................ 2-19
Connecting Cables, Gas Lines,
and Isolation Transformer .................. 2-20
GPIB Cable .................................. 2-20
Purge Line .................................... 2-23
Air Cool Line ............................... 2-25
Power Cable ................................. 2-26
Isolation Transformer .................. 2-27
Starting the 2940 ....................................... 2-29
Shutting Down the 2940 ........................... 2-31
Summary of Contents for TMA 2940
Page 18: ...TA INSTRUMENTS TMA 2940 XVIII...
Page 20: ...Introduction 1 2 TA INSTRUMENTS TMA 2940...
Page 34: ...Introduction 1 16 TA INSTRUMENTS TMA 2940...
Page 36: ...Installation TA INSTRUMENTS TMA 2940 2 2...
Page 62: ...Installation TA INSTRUMENTS TMA 2940 2 28 Figure 2 17 Isolation Transformer Cable Connections...
Page 66: ...Installation TA INSTRUMENTS TMA 2940 2 32...
Page 138: ...Using Your Options TA INSTRUMENTS TMA 2940 4 48...
Page 140: ...5 2 TA INSTRUMENTS TMA 2940 Technical Reference...
Page 150: ...5 12 TA INSTRUMENTS TMA 2940 Technical Reference...
Page 152: ...Maintenance and Diagnostics TA INSTRUMENTS TMA 2940 6 2...
Page 168: ...Maintenance and Diagnostics TA INSTRUMENTS TMA 2940 6 18...