8—1
Annex
8.
Installation
of
steel
roof
in
the
sizes
10
‐
150
8.1
Overview
Mount
rails
A1,
B2,
C3,
D4,
E5
on
the
unit
for
support
of
trapezoidal
roof
plates
(mount
also
rails
Y
and
Z
on
units
of
the
size
30
and
on
units
that
are
larger
than
size
30
longitudinally
at
the
centre
‐
line
of
the
units).
Place
foam
bands
–
P
–
on
the
horizontal
rails
A1,
B2,
C3
and
D4
for
support
of
roof
plates.
Calculate
overhang
of
the
roof
at
both
ends
of
the
unit
and
mount
roof
overhang
profile
–
G1
on
the
first
trapezoidal
roof
plate
–
F1
before
the
roof
plate
is
mounted.
Place
and
mount
roof
plates
F1,
F2,
F3
and
so
on.
Remember
foam
bands
on
the
side
laps
between
roof
plates
to
prevent
rainwater
from
passing
through.
Place
roof
overhang
profile
–
G5
at
the
other
end
of
the
unit
before
the
last
roof
plate
is
mounted.
Mount
sides
and
corners
on
the
roof.
Apply
sealing
where
plates
are
joined
to
ensure
water
resistance
‐
even
in
stormy
weather.
8.1.1
Mount
rails.
Units
of
size
10,
15,
20,
and
25
Squeeze
sealant
in
sufficient
quantity
between
the
underside
of
the
rails
A1,
B2,
C3,
D4,
E5
and
the
horizontal
top
side
of
the
unit
before
the
rails
are
mounted.
This
means
that
the
rails
are
standing
on
Summary of Contents for Danvent DV-10
Page 16: ...15 DVE Plug fan DVD Silencer DVX Humidifier...
Page 57: ...56...
Page 84: ...8 8...
Page 88: ...9 4 9 1 3 Information about connection of cables to terminals on the control board...
Page 91: ...9 7...
Page 103: ...9 19...
Page 111: ...12 3...
Page 115: ...12 7 Frequency converter is always necessary for the control of each PM motor...
Page 119: ...13 1 Annex 13 Commissioning See separate cover with annexes 1 2 3 and 13...