29
i.2.11
Refitting
of
guards
The
guard
is
a
safety
guard
installed
inside
the
door.
Tools
are
necessary
for
the
removal
of
the
guard.
If
the
guard
has
been
demounted
during
the
installation
on
the
site,
the
guard
must
be
refitted
before
startup
of
the
unit.
Insert
the
edges
of
the
guard
in
the
frame
profile
in
the
groove
that
is
in
the
frame
profile,
and
connect
both
parts
of
the
guard
at
the
middle
with
2
screws.
Replace
the
vibration
damping
foam
rubber
list
if
it
is
damaged.
i.3.
Installation
‐
electrical
i.3.1
Necessary
overvoltage
protection
device,
that
leads
lightning
overvoltage
to
an
earth
lead
on
a
safe
way.
The
Installer
and
user
must
be
aware
of
the
fact
that
lightning
strikes
make
a
risk
that
requires
installation
of
overvoltage
protection
devices
to
lead
the
lightning
overvoltage
to
an
earth
lead
in
a
safe
way.
Installer
and
user
must
take
care
of
this
according
to
local
statutory
requirements.
i.4
Installation
–
Pipes
for
water
–
hot
and
chilled,
valves
and
drains
i.4.1
Description
If
ordered
with
the
unit,
the
valves
and
valve
motors
are
stored
in
a
carton
box
placed
inside
the
unit.
Water
trap(s)
–
standard
or
optional
‐
is
(are)
necessary
to
ensure
escape
of
water
from
the
tray
under
plate
heat
exchanger
and
(or)
cooling
coil.
Water
trap(s)
is
(are)
stored
in
a
carton
box
placed
inside
the
unit.
Summary of Contents for Danvent DV-10
Page 16: ...15 DVE Plug fan DVD Silencer DVX Humidifier...
Page 57: ...56...
Page 84: ...8 8...
Page 88: ...9 4 9 1 3 Information about connection of cables to terminals on the control board...
Page 91: ...9 7...
Page 103: ...9 19...
Page 111: ...12 3...
Page 115: ...12 7 Frequency converter is always necessary for the control of each PM motor...
Page 119: ...13 1 Annex 13 Commissioning See separate cover with annexes 1 2 3 and 13...