Table 10-25
Options on the
Update ASF Configuration Settings
task page
(continued)
Description
Option
Check to modify the settings in this group when the
task runs.
You can enable Operator, or Administrator rights, or
both.
Modify remote control settings
Check to enable a low latency reset of the system.
ASF Reset
Check to enable unconditional power-down (occurs
without any blocking from software or system).
ASF Power down
Check to ensure that the sleeping system can be
remotely turned on.
ASF Power up
Check to enable a hard reset of the system. This reset
is functionally equivalent to an unconditional
power-down operation, followed by a power-up.
ASF Power cycle
Check if you want the configuration inventory to be
sent to Notification Server after this task runs on the
client computer.
Refresh inventory on settings
change
Update DASH Configuration Settings task
This task lets you enable DASH and configure DASH settings remotely on client
computers.
Note:
The Out of Band Task Agent must be installed on the client computers
before you run the task. The client computer must be turned on to run this task.
The operating system must be running.
See
“Preparing target computers for management”
on page 49.
See
“Configuring ASF/DASH computers for out-of-band management”
on page 111.
Table 10-26
Options on the
Update DASH Configuration Settings
task page
Description
Option
Check to enable DASH.
Enable DASH
About Out of Band Management Component pages
Update DASH Configuration Settings task
160