![Swan Analytical Instruments AMI INSPECTOR Conductivity Operator'S Manual Download Page 17](http://html1.mh-extra.com/html/swan-analytical-instruments/ami-inspector-conductivity/ami-inspector-conductivity_operators-manual_1411377017.webp)
AMI INSPECTOR Conductivity
Installation
A-96.250.611 / 120617
15
3.2.
Connecting Sample Inlet and Outlet
3.2.1
Swagelok Fitting Stainless Steel at Sample Inlet
Preparation
Cut the tube to length and deburr it. The tube must be straight and
free from blemishes for approximately 1,5 x tube diameter from the
end.
Lubrication with lubricating oil, MoS2, Teflon etc. is recommended
for the assembly and reassembly of bigger sized unions (thread,
compression cone).
Installation
1
Insert the compression ferrule [C] and the compression cone
[D] into the union nut [B].
2
Screw on the union nut onto the body, do not tighten it.
3
Push the stainless steel pipe through the union nut as far as it
reaches the stop of the body.
4
Tighten down the union nut 1¾ rotation using an open ended
spanner. Hold Body from turning with a second wrench.
3.2.2
Sample Outlet
Flexible tube 8x6 mm. Connect the tube to the serto elbow union
and insert it into a pressure free drain of sufficient capacity.
A
B
C
D
E
F
Tube
Union nut
Compression
ferrule
Compression
cone
Body
Tightened
connection
A
B
C D
E
F
A
B
C
D
Elbow union
Compression ferrule
Knurled nut
Flexible tube
B
C
D
A