Chapter 2: Server Installation
27
Figure 2-9. Intalling the Connectors 3 and 4
3. Slide CMA connector #3 forward onto the two posts on the rear of the left middle rail. It
snaps into place.
4. For CMA connector #4, align the metal tabs with the slots on the rear of the left outer
rail and push it forward. It snaps into place.
4
3
Chassis Front
4
3
Summary of Contents for SuperServer 8049U-E1CR4T
Page 1: ...USER S MANUAL Revision 1 0a SuperServer 8049U E1CR4T...
Page 54: ...SuperServer 8049U E1CR4T User s Manual 54 Figure 3 13 Installing the PWS Air Shroud...
Page 157: ...Appendix G BSMI Chinese Safety Warnings 157 WARNINGS 1 100V 240V 10 2 3 4 1 2 3 4 5 1 2 3 4...
Page 158: ...158 1 2 1 2 3 4 SuperServer 8049U E1CR4T User s Manual...
Page 160: ...160 SuperServer 8049U E1CR4T User s Manual 100 127V 60 50Hz 12 0A 200 240V 60 50Hz 9 6A...