Chapter 2: Server Installation
25
Figure 2-7. Cable Managment Arm and Velcro Straps
2.5 Installing the Cable Management Arm
The system supports a cable management arm (CMA) that keeps the rear cables organized
and clear of the rail mechanisms when the system is extended out the front of the rack for
maintenance. The kit includes six fabric Velcro cable ties.
The CMA attaches to the rack mounting rails by means of four connectors. They are labeled
on the connectors 1, 2, 3, and 4.
Six Velcro Straps
Summary of Contents for SuperServer 8049U-E1CR4T
Page 1: ...USER S MANUAL Revision 1 0a SuperServer 8049U E1CR4T...
Page 54: ...SuperServer 8049U E1CR4T User s Manual 54 Figure 3 13 Installing the PWS Air Shroud...
Page 157: ...Appendix G BSMI Chinese Safety Warnings 157 WARNINGS 1 100V 240V 10 2 3 4 1 2 3 4 5 1 2 3 4...
Page 158: ...158 1 2 1 2 3 4 SuperServer 8049U E1CR4T User s Manual...
Page 160: ...160 SuperServer 8049U E1CR4T User s Manual 100 127V 60 50Hz 12 0A 200 240V 60 50Hz 9 6A...