30
1.3.4 Safe operation
Before excavation operation, thoroughly check
the underground line conditions. Precisely
identify location of individual underground
utility line such as cables, gas pipeline, water
pipeline etc.
Keep jobsite off-limits to all no operating
person.
Make sure the condition of worksite is stable
and capable of supporting the machine.
To make it easy to escape if there is any
collapse, set the tracks at right angle to the pit
with sprocket at the rear when carrying out
operation near pit.
When digging the work face under an
overhang, the overhang may collapse and fall
on top of the machine.
Do not place bucket above the head of person
or operator cab. Falling objects from bucket or
collision with bucket can cause serious injury
or death or damage to machine.
When using breakout hammer or other heavy
working equipment, there is a hazard of losing
its balance and tipping over.
Do not lower, swing or stop working device
all of sudden.
Do not extend or retract boom cylinder
suddenly, There is a risk of machine tipping
over due to impact force.
1.3.5 Operation on slopes
When operating swing or working device
during operation on slopes, there is a risk that
the machine may lose its balance or tip over.
This may cause serious injury or damage to
machine. So it’s necessary to provide a flatness
area for the machine and operate carefully.
Do not swing machine from uphill side to
downhill side, when bucket is fully loaded.
This dangerous act can cause machine to tip
over.
If the machine has to be used on a slope, pile
the soil to make a platform which can keep
machine as horizontal as possible.
Summary of Contents for SWE150F
Page 19: ...12 18 No unauthorized access label Warning Stay clear of operation area of working device...
Page 22: ...15 23 Gravity label 24 Hydraulic oil label 25 Greasing...
Page 151: ...144 4 4 9 Hose...
Page 193: ...186 5 Technical specification...
Page 197: ...190 5 1 4 Circuit diagram...
Page 199: ...192 5 1 6 Hydraulic diagram...
Page 204: ...197 5 2 4 SWE210F Circuit diagram...
Page 206: ...199 5 2 6 Hydraulic diagram...