147
4.5 Machine maintenance interval
4.5.1 Daily maintenance (every 8 hours)
Carry out following maintenance operation
before starting machine daily( every 8 hours)
:
4.5.1.1 Greasing work equipments
(
1
)
boom cylinder foot, 2 places
(
2
)
boom foot pin ( 2 places)
(
3
)
boom cylinder rod end (2 places)
(
4
)
arm cylinder foot pin(1 place)
(
5
)
boom – arm connecting pin ( 2 places)
(
6
)
arm cylinder rod end (1 place)
(
7
)
bucket cylinder foot pin (1 place)
(
8
)
arm –link connecting pin( 1 place)
(
9
)
arm – bucket connecting pin( 1 place)
(
10
)
link connecting pin( 2 places)
(
11
)
bucket cylinder rod end.(1 place)
(
12
)
bucket – link connecting pin( 2 places)
Summary of Contents for SWE150F
Page 19: ...12 18 No unauthorized access label Warning Stay clear of operation area of working device...
Page 22: ...15 23 Gravity label 24 Hydraulic oil label 25 Greasing...
Page 151: ...144 4 4 9 Hose...
Page 193: ...186 5 Technical specification...
Page 197: ...190 5 1 4 Circuit diagram...
Page 199: ...192 5 1 6 Hydraulic diagram...
Page 204: ...197 5 2 4 SWE210F Circuit diagram...
Page 206: ...199 5 2 6 Hydraulic diagram...