Li.ONESS Batteries
| Operation, Safety and Installation Manual
18
• Li.ONESS Module No 1 BATTERY COM (Right side
RJ45 connector) connected to Li.ONESS Module
No 2 BATTERY COM IN (Left side RJ45 connector)
and so on until all modules have been connected as
seen in picture 27.
• The Shunt box will be connected to the PBT unit as
described below:
- The front side Negative (-) Black connection post will
be connected to the negative (-) Black post of the
first Li.ONESS module.
- The 4-pin Molex connector of the Shunt Box will
be connected to the Current Measurement Molex
connector located at the right-hand side of the PBT
unit.
- The back side Negative (-) Black connection post will
be connected to the negative (-) Black connection
point of the inverter / charger
Notes
• The Shunt box will be installed at maximum of 3m
from the inverter/charger.
• The installation point will be located at the end of the
NEGATIVE (-) Bus bar closer to the inverter side in
order to measure the total system’s battery current.
Picture 27
Li.ONESS system, CAN communica-
tion connection
Picture 28
Shunt Box connection
EN