Li.ONESS Batteries
| Operation, Safety and Installation Manual
32
Download and install VE Configuration tools
from:
https://www.victronenergy.com/
supportanddownloads/software
Connect your computer to a VE.Bus product.
MK3-USB interface and RJ45 UTP cable are
required. Computer with internet connection
will automatically download correct driver.
Update all components to latest firmware, follow
instructions on:
https://www.victronenergy.com/live/updating_
firmware:updating_ve.bus_products
https://www.victronenergy.com/live/
ccgx:firmware_updating Color Control settings:
It is also required to Update CCGX to 2.40 or
higher.
CCGX Device Settings
Before you operate the inverter with the
Li.ONESS, you must complete the following
steps, in order to successfully communicate with
Sunlight’s BMS:
1. From Device list go to Settings menu Services
Services Can-bus Profile Select Can-bus BMS
(500 kbit/s) and apply the settings
Then, go back to
Device list and Sunlight’s
Li.ONESS will appear as shown at the following
print screen
2. Return to Settings Tab and go to System Setup
Battery monitor Sunlight on Can-bus and
apply the settings with the following symbol
The Battery Monitor Tab selections are shown
below
Picture A2.4
CCGX display Services Tab
Picture A2.5
CCGX display Device list Tab
Picture A2.6
CCGX display Battery Monitor Tab
EN