Chapter 9
Servicing the Expansion Cabinet
9-3
9. Remove remote power sequencer cable (P14/P15).
10. Remove the power sequencer from the Sun StorEdge 6320 system.
9.1.2
Replacing the Power Sequencer
1. Slide the power sequencer into the system (
).
2. Tighten the screws that secure the sequencer to the chassis.
3. Reconnect the grounding strap to the power sequencer.
4. Connect the AC power cable to the power sequencer.
See Section 9.2.2, “Replacing the AC Power Cable” on page 9-5.
5. Connect all cables to the back of the power sequencer.
6. Connect the AC power cable to a grounded outlet.
7. Power on the power sequencer.
See the Sun StorEdge 6320 System Installation Guide.
9.2
Servicing the AC Power Cable
This subsection describes the removal and replacement of the AC power cable.
lists the FRUs associated with the power cable:
No tools are required to remove or replace the power cable.
TABLE 9-2
AC Power Cable FRU List
FRU Description
Assembly, cable, rack AC input, international
Assembly, cable, rack AC input, domestic
Summary of Contents for StorEdge 6320 System 1.0
Page 12: ...xii Sun StorEdge 6320 System 1 0 Reference and Service Manual May 2003...
Page 16: ...xvi Sun StorEdge 6320 System 1 0 Reference and Service Manual May 2003...
Page 44: ...1 12 Sun StorEdge 6320 System 1 0 Reference and Service Manual May 2003...
Page 54: ...2 10 Sun StorEdge 6320 System 1 0 Reference and Service Manual April 2003...
Page 66: ...3 12 Sun StorEdge 6320 System 1 0 Reference and Service Manual May 2003...
Page 110: ...6 6 Sun StorEdge 6320 System 1 0 Reference and Service Manual May 2003...
Page 124: ...8 10 Sun StorEdge 6320 System 1 0 Reference and Service Manual May 2003...
Page 142: ...11 4 Sun StorEdge 6320 System 1 0 Reference and Service Manual May 2003...
Page 158: ...12 16 Sun StorEdge 6320 System 1 0 Reference and Service Manual May 2003...
Page 172: ...Glossary 4 Sun StorEdge 6320 System 1 0 Reference and Service Manual May 2003...