Chapter 6
Cabling the System
107
FIGURE 6-46
Opening the Cage Clamp Using a Screwdriver
7. Feed the exposed section of the appropriate wire into that hole in the DC input
plug.
FIGURE 6-47
shows which wires should be inserted into each hole in the DC input
plug.
FIGURE 6-47
Assembling the DC Input Power Cable
8. Repeat Step 6 and Step 7 for the other two wires to complete the assembly of the
DC input power cable.
9. Repeat Step 4 through Step 8 to create as many DC input power cables as you
need for your unit.
You will need one DC input power cable for every power supply that you have in
the Netra ct server chassis.
Top of input plug
Top of connector
From -48V Return
From chassis ground (green/yellow)
From -48V
123
Summary of Contents for Netra ct
Page 18: ...xviii Netra ct Server Installation Guide September 2002...
Page 20: ...2 Netra ct Server Installation Guide September 2002...
Page 36: ...18 Netra ct Server Installation Guide September 2002...
Page 58: ...40 Netra ct Server Installation Guide September 2002...
Page 168: ...A 150 Netra ct Server Installation Guide September 2002...