1
C H A P T E R
1
Installation Overview
This chapter provides an overview of the tasks to install the Netra ct server. Detailed
instructions for each task are provided on the pages specified.
Task
Detailed Instructions
Prepare your site for installation by checking the room
and rack spacing, and the DC power source.
Page 3
Mount the chassis in a rack.
Page 19
Connect the DC grounding cable.
Page 29
Install the Netra ct server, if necessary.
Page 31
Install optional cards, such as I/O cards.
Page 41
Connect the cables to the CPU card and/or a CPU
transition card.
Page 58 (CPU card)
Page 62 (CPU front transition
card)
Page 87 (CPU rear transition
card)
Connect the cables to the alarm card or to the alarm rear
transition card.
Page 77 (alarm card)
Page 97 (alarm rear transition
card)
Connect the cables to any additional cards you installed.
Page 87 (front-access I/O cards)
Page 103 (rear-access I/O cards)
Connect any optional external SCSI devices.
Page 143
Assemble and connect the DC input power cables to the
server.
Page 103
Power on the server.
Page 122
Install the server software.
Page 131
Connect any optional external SCSI devices.
Page 143
Summary of Contents for Netra ct
Page 18: ...xviii Netra ct Server Installation Guide September 2002...
Page 20: ...2 Netra ct Server Installation Guide September 2002...
Page 36: ...18 Netra ct Server Installation Guide September 2002...
Page 58: ...40 Netra ct Server Installation Guide September 2002...
Page 168: ...A 150 Netra ct Server Installation Guide September 2002...