3
C H A P T E R
2
Site Preparation
This chapter describes how to prepare your site for installing the Netra ct server.
This chapter contains the following topics:
■
“Tools Required” on page 3
■
“Planning the Placement of the Rack” on page 4
■
“Planning the Rackmounting Configuration” on page 6
■
“Chassis and Server Physical Specifications” on page 9
■
“DC Source Site Requirements” on page 13
■
“Connecting Logic Ground and Chassis Ground” on page 14
■
“Cooling Requirements” on page 15
■
“Environmental Specifications” on page 17
Tools Required
You will need the following tools to perform the procedures in this document:
■
No. 1 Phillips screwdriver
■
No. 2 Phillips screwdriver
Summary of Contents for Netra ct
Page 18: ...xviii Netra ct Server Installation Guide September 2002...
Page 20: ...2 Netra ct Server Installation Guide September 2002...
Page 36: ...18 Netra ct Server Installation Guide September 2002...
Page 58: ...40 Netra ct Server Installation Guide September 2002...
Page 168: ...A 150 Netra ct Server Installation Guide September 2002...