Chapter 4
Installing a Server Into a Chassis
33
6. Carefully remove the plastic wrapping from the Netra ct server and, using the
handle at the top of the server, lift it up and completely away from the box.
7. If there is a cover over the midplane, carefully remove the cover from the
midplane.
▼
To Install the Servers in the Chassis
Caution –
If any slots are left unfilled in the chassis, an energy hazard is present.
Caution –
If you have a rear-access model server, you must verify that all the rear
transition cards have been completely unseated before proceeding with these
procedures. If you attempt to insert a server without unseating the rear transition
cards, you will damage the connector pins on the midplane when you insert the
server.
1. With your left hand, grasp the flat vertical purple handle to the left of the power
supply unit.
2. With your right hand, grasp the purple server bar at the top of the server, and
insert the server into the chassis using the flat vertical handle and the server bar.
FIGURE 4-2
shows how to insert a Netra ct 800 server into the chassis and
FIGURE 4-3
shows how to insert a Netra ct 400 server into the chassis.
Summary of Contents for Netra ct
Page 18: ...xviii Netra ct Server Installation Guide September 2002...
Page 20: ...2 Netra ct Server Installation Guide September 2002...
Page 36: ...18 Netra ct Server Installation Guide September 2002...
Page 58: ...40 Netra ct Server Installation Guide September 2002...
Page 168: ...A 150 Netra ct Server Installation Guide September 2002...