+
+
5
-
R
EPLACEMENT
OF
THE
WEIGHING
BLADES
C4.2
4-
Position a 16 x 100 screw on each side to secure the unit.
5-
Remove the upper blades
6-
Assembling double blades.
For the complete replacement of the weighing blades,
you must order: 4 kits, 911035.
Every kit consists of:
4 HSHC screws, 16 x 65, 2 threaded plates, 4 locknuts,
4 x W16 stainless steel washers, 4 x M16 washers and 2 spring blades.
7-
Following the replacement of the parts, first reassemble the upper blades without locking the screws.
Then, at the lower level, remove the 16 x 100 safety screws and mount the new blades without locking the screws.
8-
Centre the triangle so there is no friction and secure the screws to 18 daN.m.
9-
Remove the nut on the pressure screw.
10-
Check the dimension of the spring
on the pressure screw:
67 to 71 mm.
(See sheet C5)
11-
Perform a calibration of the weighing device.
(see sheet D1)
4
5
6
Assembling double blades
N
AME
: T
RAINING
D
EPARTMENT
D
ATE
: 2017
P
AGE
:
17 / 59
R
EFERENCE
: T
ECHNICIAN
’
S
O
PERATING
M
ANUAL
X40+-X50+ ISOBUS
I
ND
03