CyberAiR DX Floor Mounted IOM Manual
TABLE OF CONTENTS
1.0
1.1
1.2
1.3
1.3.1
1.3.2
1.4
1.4.1
1.4.2
1.4.3
1.4.4
1.4.5
1!!!!
!!!!!
1.4.8
1.4.9
1.5
1.5.1
1.5.2
1.5.3
1.5.4
1.5.5
1.5.6
1.6
1.6.1
1.7
1.8
Introduction ...................................... 1-1
General ...................................................... 1-1
Product Description ................................... 1-1
Safety ......................................................... 1-2
General ...................................................... 1-2
Safety Summary ........................................ 1-2
General Design .......................................... 1-4
Internal Layout - Upflow Model .................. 1-5
Internal Layout - Downflow Model ............. 1-6
Electric Box Access ................................... 1-6
Circuit Breakers/Motor Start Protectors ..... 1-6
Compressors ............................................. 1-7
Coils ........................................................... 1-7
EC Fans ..................................................... 1-7
Temperature/Humidity Sensor ................... 1-7
Heaters ...................................................... 1-8
Optional Equipment ................................... 1-8
Humidifier ................................................... 1-8
Condensate Pump ..................................... 1-8
Water Detector. .......................................... 1-8
Smoke Detector ......................................... 1-8
Firestat ....................................................... 1-8
Auto Power Transfer Switching .................. 1-8
Dual Cooling Circuits ................................. 1-9
Tandem Compressor Option ...................... 1-9
Free-Cooling Operation ........................... 1-10
Alternate Water Source Operation........... 1-11
Types of Control ......................................... 2-8
2.6.4.1 Remote Temperature/Humidity Sensor...... 2-8
2.6.5
Remote Water Detector ............................. 2-9
2.7
Piping Connections .................................... 2-9
2.7.1
Refrigerant Piping ...................................... 2-9
2.7.2
Water/Glycol and Hot Water Piping ......... 2-11
2.7.3
Condensate Drain .................................... 2-11
2.7.2.1
Gravity Drain ............................................ 2-11
2.7.2.2
Condensate Pump ................................... 2-12
2.7.3
Humidifier ................................................. 2-12
2.8
Utility Connections ................................... 2-13
2.8.1
Main Power .............................................. 2-13
2.8.2
Optional Equipment.................................. 2-15
2.8.2.1
Remote Temperature/Humidity Sensor ... 2-15
2.8.2.2
Remote Water Detector ........................... 2-15
2.8.3
Interconnecting Remote Equipment ......... 2-15
2.9
System Charging Procedures .................. 2-17
2.9.1
Water-Water/Glycol Systems ................... 2-17
2.9.2
Refrigerant Charging ................................ 2-17
2.9.3
Estimating Refrigerant Charge ................. 2-17
2.9.4
Preparing System For Charging............... 2-19
2.9.5
Refrigerant Charging Procedures ............ 2-20
2.9.6
Refrigerant Characteristics ...................... 2-22
2.10
Settings and Adjustments ........................ 2-22
3.0
Start-Up/Commissioning ................. 3-1
3.1
Operation ................................................... 3-1
2.0
Installation ........................................ 2-1
2.1
Receiving the Equipment ........................... 2-1
2.2
Site Preparation ......................................... 2-1
2.2.1
Conditioned Space .................................... 2-1
2.3
Rigging ...................................................... 2-2
2.4
Mounting/Placement .................................. 2-2
2.5
Air Distribution Connection ........................ 2-4
2.5.1
Upflow Configuration Air Patterns ............. 2-4
2.5.2
Downflow Configuration Air Patterns ......... 2-5
2.6
Optional Equipment (Field Installed) ......... 2-5
2.6.1
Floor Stands .............................................. 2-5
2.6.2
Plenum Box ............................................... 2-7
2.6.3
Condensate Pump ..................................... 2-8
3.2
Step by Step Start-Up Instructions ............. 3-1
3.3
Microprocessor Controller
Programming ............................................. 3-1
4.0
Maintenance/Repairs ........................ 4-1
4.1
Periodic General Maintenance ................... 4-1
4.1.1
Precision A/C Unit ...................................... 4-1
4.1.2
Humidifier ................................................... 4-2
4.1.3
Condensate Pump ..................................... 4-2
4.1.4
Condenser ................................................. 4-2
4.2
Troubleshooting ......................................... 4-2
4.3
Field Service .............................................. 4-6
4.3.1
Leak Detection ........................................... 4-6
4.3.2
Leak Repair ................................................ 4-6
4.3.3
Refrigerant Piping ...................................... 4-6
i