CyberAiR DX Floor Mounted IOM Manual
APPENDIX A —FORMS
Checklist for Completed Installation
1 Proper clearances for service access have
been maintained around equipment.
2 Equipment is level and mounting fasteners
(if applicable) are tight.
3 Piping completed to refrigerant or coolant
loop (if required).
4 All field installed piping leak tested.
5 Refrigerant charge added (if required).
6 Condensate pump installed (if required).
7 Condensate drain line connected and trap
is filled with water.
8 Water supply line connected to humidifier
(if required). If manual cut-off valve is
installed, open valve.
9 Humidifier “On/Off/Drain” switch is in “On”
position.
10 Plenum box installed (if required).
11 Filter(s) installed.
12 Ductwork completed (if required).
13 Incoming line voltage matches
equipment nominal nameplated rating ±
tolerances.
14 Main power wiring connections to the
equipment, including earth ground, have
been properly installed.
15 Customer supplied main power circuit
breaker (HACR type) or fuses have proper
ratings for equipment installed.
16 All wiring connections are tight.
17 Control wiring connections completed to
evaporator and condenser/condensing
unit
(if required), including wiring to wall
mounted control panel and optional controls.
18 Foreign materials have been removed from
inside and around all equipment installed
(ship- ping materials, construction materials,
tools, etc.).
19 Inspect all piping connections for leaks
during initial operation.