background image

 

CyberAiR DX Floor Mounted IOM Manual

 

 

 

1.5.2 

Condensate Pump 

An optional condensate pump may be factory 

installed. The pump automatically eliminates 

condensate and humidifier flush water (if applicable) 

from the drain pan. An internal overflow safety switch 

is wired to the system controller to automatically signal 

an alarm should an overflow occur.

 

1.5.3 

Water Detector 

As an option, STULZ offers spot type or strip/cable 

type water detectors (see Section 2.6.5). Upon 

sensing a leak, the water detector control circuit will 

signal the system controller of the alarm condition.

 

1.5.4  Smoke Detector 

Optionally mounted in the return air stream, a photo- 

electric smoke detector is used to sense the 

presence of smoke and signal the controller when a 

smoke alarm condition exists. The system controller 

is programmed to shut down the compressor and the 

fans when smoke is detected. When the alarm 

condition is cleared, a manual re-set is required by 

cycling the main power service disconnect switch off 

and on.

 

1.5.5 

Firestat 

Optionally mounted in the return air stream, a fire 

detector senses high return air temperature and 

signals the controller when a fire alarm condition 

exists. The system controller is programmed to shut 

down the compressor and the fans when fire is 

detected. When the alarm condition is cleared, the 

reset button on the firestat must be manually pressed 

to resume operation.

 

NOTE

 

The  smoke  detector  and  firestat  are  not 

designed to  operate  as  room  smoke/fire 

detection  systems that may be required by 

local or national codes.

 

 

1.5.6 

Auto Power Transfer Switching 

An  automatic transfer, main  power switching 

system is optionally available for critical operations. 

With  this option, two  main  power service 

disconnect switches

 

are  provided  on the door  of the cabinet  to  connect 

two independent power sources (see Figure 3).

 

 

 

Figure 3- Auto Transfer Disconnect Switches

 

If the user selectable main power source is 

interrupted or, if a phase loss or imbalance occurs, 

the automatic transfer switching circuitry 

immediately transfers operation of the precision A/C 

system to a secondary power source. If power is 

transferred, the system controller provides an alarm 

signal and the alarm display indicates which power 

source failed. When the primary power source is 

functionally restored,

 

the operation of the A/C system is automatically 

transferred back to the primary power source.

 

An indicator light is provided above each main power 

service disconnect switch (see Figure 3). A light 

illuminates above the switch that’s selected to supply 

power to the A/C system, whether the unit is running 

or not, indicating that power is available at the 

switch.

 

A preferred power selector switch is included with 

the auto-transfer switching option. It is mounted 

inside the cabinet at the top of the electric box (see 

Figure 16). This switch may be used to manually 

transfer the power source and/or test the auto 

transfer switching function.

 

1.6  Dual Cooling Circuits

 

STULZ CyberAir DX systems are designed with two 

stages of cooling. The cooling circuits are typically 

comprised of one compressor per circuit. The circuits 

are staged to operate as needed, based on 

incremental cooling stage enable temperature set 

points as programmed in the system controller. Each 

stage is assigned an offset to the temperature set 

point for turning the compressors on. The controller 

turns each stage on and off as needed based on the 

temperature set point plus offset value (reference 

Section 4.5.1.2

 

in the 

E² 

Series Controller Manual). The 

compressor circuits rotate after each run cycle in 

an effort to promote equal run-times.

 

 

 

 

1-8

 

Summary of Contents for CyberAir DX Series

Page 1: ...CyberAir DX Installation Operation and Maintenance Manual Perimeter Mounted Precision Air Conditioners 21 kW 105 kW 60 Hz...

Page 2: ...gy Systems Inc STULZ This document contains confidential and proprietary information of STULZ Air Technology Systems Inc Distributing or photocopying this document for external distribution is in dire...

Page 3: ...onnections 2 13 2 8 1 Main Power 2 13 2 8 2 Optional Equipment 2 15 2 8 2 1 Remote Temperature Humidity Sensor 2 15 2 8 2 2 Remote Water Detector 2 15 2 8 3 Interconnecting Remote Equipment 2 15 2 9 S...

Page 4: ...uration 1 9 Figure 5 Free Cooling Operation 1 10 Figure 6 Alternate Water Source Operation 1 11 Figure 7 Recommended Installation Clearance 2 1 Figure 8 Typical CFU Upflow Installation 2 2 Figure 9 Ty...

Page 5: ...stems D Downflow U Upflow 021 028 035 053 070 088 105 D DX 2 Dual Circuit A Air G Glycol W Water 0 None Water Side Economizer Alternate Water Source I In Unit 0 Standard T Tandem Compres sors S Specia...

Page 6: ...Hr Refer to the unit nameplate to identify the model number and cooling capacity of yourunit NOTE STULZ CyberAir systems are strictly for non residential applications The functional modes of operation...

Page 7: ...ell ventilated area Avoid inhalation of solvent fumes and prolonged exposure of skin to cleaning solvents Wash exposed skin thoroughly after contact with solvents This equipment should be serviced and...

Page 8: ...r thermal protective gloves and face shield goggles when working with refrigerant Application of excessive heat to any component will cause extreme pressure and may result in arupture Exposure of refr...

Page 9: ...ing to system capacity Figures 1 and 2 depict the internal layouts of STULZ upflow and downflow CyberAir units and identifies the major components Location of the major components may vary depending o...

Page 10: ...IR FILTERS CUT AWAY TO CONDENSATE PUMP LOCATION MAY Air Flo w Downflow Models Floor Discharge Air Flow Plenum Extension Optional Internal Air Filters Accessible Behind Front Cabinet Doors 1 4 1 Intern...

Page 11: ...ols energized the unit could begin operating at any time To prevent personal injury stay clear of rotating components as automatic controls may start them unexpectedly The main power service disconnec...

Page 12: ...f electronics e Over heating of motor If a communication loss occurs the fans will run at their last received output command until a new CyberAiR DX Floor Mounted IOM Manual command is received Modbus...

Page 13: ...in power service disconnect switches are provided on the door of the cabinet to connect two independent power sources see Figure3 Figure 3 Auto Transfer Disconnect Switches If the user selectable main...

Page 14: ...w Stage Cut in Offset Compressor s Capacity 1 2 F 1A 5 tons 2 3 F 2 10 tons 3 4 F 1B 2 15 tons 4 5 F 1A 1B 2 20 tons CyberAiR DX Floor Mounted IOM Manual 1 6 1 2 Four Stage Compressor Rotation Compres...

Page 15: ...e return air temperature s deviation from set point If the return air temperature continues to rise the free cooling valve position eventually reaches 100 open maximizing the flow of coolant through t...

Page 16: ...r if the AWS control valve reaches 100 open for the compressor delay period 20 seconds adjustable the compressor turns on and operates in parallel with AWS cooling The compressor runs until the cut ou...

Page 17: ...ped inside the air conditioner unless specified otherwise by the customer The plenum box if applicable is shipped separately Unpack and store these items in a safe place unless you are using them imme...

Page 18: ...unit is shipped on a skid to facilitate moving prior to installation The unit should always be stored indoors in a dry location prior to installation CAUTION When moving the unit it must be kept leve...

Page 19: ...cabinet s overall base dimension so the weight of the A C unit is supported by the stand Figure 9 Typical CFD Downflow Installation NOTE These units use welded frame construction for unit rigidity The...

Page 20: ...2 or 3 way discharge air plenum box see Figure 10 The return air pattern is front freereturn The supply air outlet is provided with a flange for connecting ductwork refer to the installation drawing...

Page 21: ...local codes when determining ducting requirements The duct system should be designed to allow the air to move with as little resistance as possible Figure 11 Downflow Configuration Air Patterns 2 6 O...

Page 22: ...weldment to raise or lower the floor stand Lock the height in place by tightening the top hex nut up against the fixed hex nut in the floor stand leg ATTACHMENT PLATES QUANTITY VARIES Low Seismic Flo...

Page 23: ...ews into the floor stand through the lower holes in the attachment plate and into the base of the A C unit through the upper holes in the plate Ensure all the screws are tightened Take care not to str...

Page 24: ...efield installed in the supply air stream Position the sensor at least 6 feet away from the supply air outlet The supply air temperature and humidity are monitored by the system controller and compare...

Page 25: ...d with your unit 2 7 Piping Connections Field piping connections for the system refrigerant water water glycol and optional hot water reheat piping are sweat connections CFD downflow units typically h...

Page 26: ...ning the standardequivalent lengths in feet of straight pipe Equivalent Length ft of Straight Pipe OD In Line Size Globe Valve Angle Valve 90 Elbow 45 Elbow Tee Line Tee Branch 1 2 9 0 5 0 0 9 0 4 0 6...

Page 27: ...the factory Before installing the interconnecting piping release the pressure via an available stem valve or Schrader valve prior to uncapping the pipes NOTE Water glycol cooled systems with low enter...

Page 28: ...installed from the end of the drain line to the inlet side of the condensate pump see Figure 14 2 7 4 Humidifier STULZ CyberAir systems utilize an electrode steam humidifier A water supply line for t...

Page 29: ...main power disconnect switch Do NOT rewire the unit s individual components WARNING Verify power is turned off before making connections to the equipment NOTE All wiring must conform to local and nat...

Page 30: ...ate with power source A unless a switchover auto or manual occurs See Section 1 5 6 The size of the electric box and location of components vary according to the STULZ CyberAir model and options selec...

Page 31: ...ter cooled condenser do not require field wiring to external components other than to optional sensors as selected e g Flow Sensors Remote Supply Air T H sensor Air Pressure Customer Alarm Inputs 2 8...

Page 32: ...A 70 N E C SEE NOTE 1 2 Figure 17 Field Wiring Glycol Systems Single Point Power Connection Shown for Drycooler Pump Package Figure 18 Field Wiring Air Cooled Systems 2 16 MAIN POWER SUPPLY 208 575V 3...

Page 33: ...ding charge which must be removed before piping and charging the unit Before charging check the unit nameplate to confirm that charging is performed with the correct type of refrigerant CyberAiR syste...

Page 34: ...Approximate R 410A Charge Model Number Base Charge Circuit 1 Base Charge Circuit 2 CFD 021 D2A 2 7 lbs 2 7 lbs CFU 021 D2A 2 7 lbs 2 7 lbs CFD 028 D2A 2 7 lbs 2 7 lbs CFU 028 D2A 2 7 lbs 2 7 lbs CFD...

Page 35: ...at this point leaks may be detected by observing if there s been a change in the standing pressure after 12 hours A significant drop in pressure 10 psig indicates a leak in the system that needs to be...

Page 36: ...to charge 8 Replace the Schrader valve cores if you removed them during the evacuation steps You maynow introduce the refrigerant charge through the Schrader valves 2 9 5 Refrigerant ChargingProcedur...

Page 37: ...intake of the condenser 9 Fill out the applicable sections of the Warranty Registration and Start Up Checklist 2 9 5 1 20 F Variable Speed Control The following instructions are for charging systems...

Page 38: ...charge pressure at 445 psig and hold it constant The condenser fan nearest the condenser header should be operating continuously All other fans if additional fans exist should be off during this time...

Page 39: ...harge pressure during low ambient operation thus ensuring proper condensing temperature The head pressure control valve requires no adjustment While the fan is running the flooded head pressure contro...

Page 40: ...it operates in full hot gas bypass operation The valve is factory set and no adjustment should be necessary If adjustment is required block one half of the coil and remove the adjustment cap from the...

Page 41: ...ating a demand for humidification Use an amp meter to determine current draw of the humidifier Visually check for vapor leaving the steam head or feel if the cylinder is warm to verify if the humidifi...

Page 42: ...the sight glass indicate a low refrigerant charge or a clogged filter drier Check for humidity in the refrigerant by viewing the color of the indicator in the center of the sight glass and comparing...

Page 43: ...lines and capillaries for vibration isolation and support as necessary Check all refrigerant and coolant lines for signs of leaks 4 2 Troubleshooting Turn off all power to the unit before conducting...

Page 44: ...tage 5 seconds 3 Loss of phase 5 seconds After causes 1 2 and 3 aboveare corrected the motor will automatically reset After causes 4 and 5 below are corrected the fan s must be manually reset by turni...

Page 45: ...IRE COMPRESSOR Compressor Fails to Start a Temperature set point too high b Compressor internal protector is open c Complete loss of refrigerant charge low pressure safety switch d Condenser pressure...

Page 46: ...iring is faulty Check wiring against schematic and rewire if necessary c Actuator failed Replace actuator Electric Heater Inoperable a Circuit breaker tripped b Temperature set point too low c Overhea...

Page 47: ...stem to ensure there are no leaks prior to recharging the system 4 3 4 General Common Repairs Component Replacement 4 3 4 1 Compressor Failure The compressor is the most important component of the air...

Page 48: ...5 Remove the liquid line drier and install an oversized liquid line filter drier one size larger than the nor mal selection size 6 Check the expansion valve sight glass and other controls to see if cl...

Page 49: ...ace the new cylinder on the side mounting slots within the unit ensuring the cylinder mounting stubs are seated properly 14 Replace the cylinder plugs on the pins ensuring the white sensor plug goes o...

Page 50: ...00 a m to 5 00 p m EST After hours support is also available Please provide your name and contact information and a support technician will return your call When calling to obtain support it is import...

Page 51: ...customers a credit application must be prepared and approved this process could take one week A 25 minimum restocking charge will be applied on returned stocked parts that were sold as spare replacem...

Page 52: ...h is in On position 10 Plenum box installed if required 11 Filter s installed 12 Ductwork completed if required 13 Incoming line voltage matches equipment nominal nameplated rating tolerances 14 Main...

Page 53: ...switch operates freely Additional Check chilled water hot water circuits for air bleed as required Coils clean and clear of obstructions Humidifier cylinder and controls operate properly Tasks Y N Tas...

Page 54: ...w up actions below If you need technical support call 888 529 1266 or email stulztechnicalsupport stulz ats com Support is available 24 7 365 Provide the model number serial number and STULZ item numb...

Page 55: ...onal Fire Protection Agency E 2 Energy Efficiency PH Phase EC Electronically Commutated PSI Pounds Per Square Inch DP Dewpoint PSIG Pounds Per Square Inch Gauge DX Direct Expansion Systems RLA Run Loa...

Page 56: ...y Systems Inc 1572 Tilco Drive Frederick MD 21704 301 620 2033 Fax 301 662 5487 info stulz ats com Technical Support 888 529 1266 www stulz usa com OCS0135 April 2019 STULZ Air Technology Systems Inc...

Reviews: