
Service and maintenance
182
Sherpa 120, 140 | 06.19
9.22 Dosage gate
– Check gap size
Operative staff:
•
Qualified staff
1. Lower the dosage gate completely.
2. Secure the machine against accidental starting and
rolling.
3. Measure the distance X between the dosage gate and
the mixing container.
– Required distance = 5 mm
4. Adjust the distance X if necessary:
– Loosen the screws (2) at the L straps (1).
– Move the L straps (1) in the oblong holes, such that
the distance X is approx. 5 mm.
– Retighten the screws (2).
Fig. 144
Summary of Contents for Sherpa 120
Page 2: ......