
25
866-795-1586 • WWW.STONEAGETOOLS.COM
ROLLER REMOVAL INSTRUCTIONS
ROLLER INSTALLATION INSTRUCTIONS
ROLLER INSTALLATION
1. Chose an alternate size or replacement set of Poly Rollers by using the reference chart in the section below to select the proper sizing.
Slide the Poly Rollers onto the Hubs. Then fasten the Hub Outer Plates and Roller Washers onto the Spline Load Rollers with the two
5/16” socket head cap screws.
(Figure 1)
2. Push the back cover back into the closed position and secure the two Quick Release Pins on the top of the AUTOBOX
®
ABX-PRO
TRACTOR.
(Figure 2)
FIGURE 1
ROLLER
WASHER
(X 2)
5/16” SHCS
BLUE GOOP
(X 2)
IDLER HUB
DRIVE HUB
HUB OUTER
PLATE (X 2)
ROLLER (X 2)
FIGURE 2
QUICK RELEASE
PINS
WARNING
Always de-energize the system before servicing or replacing any parts. Failure to do so can result in severe injury and/or death.
Keep hands, hair, and clothing clear of rotating parts.
NOTICE
This process will be typical for Poly Roller replacements on the ABX-PRO Tractor Assembly. Installation of the appropriate Roller should be
completed prior to installing the hose and tool into the AUTOBOX
®
ABX-PRO-100 Assembly.