Radius circuit installation
i
As a rule, the radius circuit is delivered complete with fitted belt elements.
For more information regarding the installation of the Workpiece Transport System,
please refer to the STEIN 300 NT operating manual, chapter 5.
5.1
Procedure
The installation procedure can be divided into 5 phases:
Preparation,
Radius circuit de-installation,
Radius circuit installation,
Connection of the radius circuit to the mains supply,
Installation of the pile-up separator.
WARNING!
On processing stations which generate shavings (for example drilling or
thread-cutting machinery), covers should be installed to avoid shavings or
cooling fluid coming into contact with the radius circuit or the drive motor.
i
Further information is available from STEIN Automation.
5.2
Preparation
DANGER!
From the Workpiece Transport System starting unexpectedly.
DANGER!
HIGH ELECTRICAL VOLTAGE!
Risk of electric shock!
i
The following information describes repair action to the radius circuit and not the initial
installation.
1 Before carrying out any installation or repair work, disconnect the relevant Work-
piece Transport System from its electrical power supply.
2 Put up warning signs to prevent the system being started up while installation and
repair work is being done.