EN - 7
5.
Motor power
6.
Motor displacement
7.
Month / Year of manufacture
8.
Serial number
9.
Article code
10.
Electrical protection rating
Write the identification data of the
machine in the specific space on the
label on the back of the cover page
IMPORTANT
Use the identification names
on the identification label of the product.
IMPORTANT
Use these means of
identification whenever you contact
an authorized service workshop.
IMPORTANT
The example of the
declaration of conformity can be found
on the last pages of the manual.
3.4 MAIN COMPONENTS
The machine is made up of the
following main components (fig. 1):
A.
Handle
B.
Starter lever
C.
Starter lever release
D.
Chute adjustment handle
E.
Extension cable support
F.
Handle pivot closure
G.
Central handle
H.
Power plug
I.
Exhaust chute
J.
Deflector
K.
Auger
L.
Auger compartment
M.
Wheel
N.
Lower blade
O.
Transport handle
P.
Lower part of handle
Q.
Cable gland
4. ASSEMBLY
For storage and transport purposes, some
components of the machine are not installed
in the factory and have to be assembled after
unpacking. Follow the instructions below.
4.1 ASSEMBLY COMPONENTS
The packaging holds the components needed for
assembly (fig. 4) listed in the following table:
Component
Fig.
N.
Snow thrower
4
1
Discharge chute adjustment handle
4.A
1
Handle
4.B
1
Handle fitting
4.C
1
Spacers and screws for
securing the handle in place
4.D, 4.E
2
Spacers and screws for
securing the handle in place
4.F, 4.G
4
Extension cable support
4.H
1
Cable gland to handle
4.I
1
Deflector
4.J
1
Instructions
-
1
4.2 UNPACKING
1.
Cautiously open the packaging, paying
attention not to lose components.
2.
Consult the documentation in the box,
including these instructions.
3.
Remove all the unassembled parts from the
box.
4.
Lift the snow thrower from the box.
5.
Dispose of the box and packaging in
compliance with local regulations.
4.3 HANDLE ASSEMBLY
1.
Assemble the central part of the
handle (fig. 4.C) on the snow thrower
(lower part of handle), fastening it with
screws (fig. 4.D, 4.E) on both sides.
2.
Position the upper handle (fig. 4.B) on the
central one and fasten it with the specific
screws and fastenings (fig. 4.G, 4.F).
3.
Fasten the electrical energy cable in place
with the specific cable gland (fig. 4.I).
4.4
DISCHARGE CHUTE ADJUSTMENT
HANDLE ASSEMBLY
1.
Assemble the handle (fig. 5.A1) using the
specific extension shaft (fig. 5.A), fastening
it in place with the 2 screws (fig. 5.A2).
Make sure the holes of the shaft (fig.
5.A) and joint (fig. 5.A1) are aligned.
2.
Insert the 2 screws in the holes and fix
3.
Pass the handle obtained in the specific
lower handle support (fig. 5.B).
4.
Insert the end of the handle in the specific
coupling hole on the chute, keeping it
straight and with the grip upwards (fig. 5.C).
5.
Check the discharge chute by turning
it entirely in both directions. The chute
must freely rotate (fig. 10).
Summary of Contents for 515 E
Page 2: ......
Page 4: ...A C B H E G C D V Hz C...
Page 5: ...x4 IJ l x2 D G C H A2 A1...
Page 6: ...C A2 A1...
Page 7: ...C C...
Page 25: ...BG 2 1 2 2 2 1 2 2 2 1 2 2 1 8 2 2...
Page 26: ...BG 3 max 30 mA...
Page 27: ...BG 4 2 3...
Page 28: ...BG 5 2 4...
Page 29: ...BG 6 2 5 2 6 2012 19...
Page 30: ...BG 7 3 3 1 230 V 3 1 1 3 1 2 3 1 3 3 2 3 II...
Page 33: ...BG 10 6 2 6 1 7 8 6 2 6 2 1 6 3 6 3 1 1 2 9 C 3 9 B 4 6 3 2 9 C...
Page 34: ...BG 11 6 4 9 B 6 5 6 5 1 20 cm 6 5 2 6 6 7 2 7 7 1 2 4...
Page 35: ...BG 12 7 2 8 30 1 2 3 4 10...
Page 36: ...BG 13 11 6 2 6 2 6 2 1 6 3 4 5 2 7 2 12...
Page 37: ...BG 14 10...
Page 38: ...BG 15...
Page 100: ...ES 2 referencias a t tulos o par grafos est n se alas...
Page 183: ...LT 12 Kondensatorius yra defektuotas Kreiptis aptarnavimo centr arba platintoj...
Page 198: ...MK 2 2 2 1 2 1 8 2 2...
Page 199: ...MK 3 30 mA 2 3...
Page 200: ...MK 4...
Page 201: ...MK 5 2 4...
Page 202: ...MK 6 2 5 2 6 2012 19 CE 3 3 1 230 V 3 1 1 3 1 2...
Page 203: ...MK 7 3 1 3 3 2 3 II 3 3 1 1 2 3 4 CE 5 6 7 8 9 10...
Page 204: ...MK 8...
Page 207: ...MK 11 6 3 1 1 2 9 C 3 fig 9 B 4 6 3 2 6 4 fig 9 B 6 5 6 5 1 20 6 5 2 6 6 7 2...
Page 208: ...MK 12 7 7 1 2 4 7 2 8 30 1 2 3 4 9...
Page 209: ...MK 13 10 11 6 2 6 2 6 2 1 6 3 4 5 2 7 2 12 1 2...
Page 210: ...MK 14...
Page 211: ...MK 15 3 10 4 5 6...
Page 263: ...UA 2 2 2 30...
Page 264: ...UA 3 2 3...
Page 265: ...UA 4 2 4...
Page 266: ...UA 5 2 5...
Page 267: ...UA 6 2 6 2012 19 3 3 1 230...
Page 268: ...UA 7 3 1 1 3 1 3 3 1 2...
Page 269: ...UA 8 3 3 3 1 1 2 3 4 CE 5 6 7 8 9 10 3 4 1 A B C D E F G H I J K L M N O P II...
Page 271: ...UA 10 5 3 10 E 5 4 11 A 11 B 11 C 6 2 6 1 7 8 6 2 6 2 1 9 C 6 3 6 3 1 1 2 9 C 3 9 B 4...
Page 272: ...UA 11...
Page 273: ...UA 12 6 3 2 6 4 9 B 6 5 6 5 1 20 6 5 2 6 6 7 2 7 7 1 2 4...
Page 274: ...UA 13 7 2 8 30 1 2 3 4 10...
Page 275: ...UA 14 11 6 2 6 2 6 2 1 6 3 4 5 2 7 2 12 1 2...
Page 276: ...UA 15 3 10 4 5 6...
Page 278: ...SK 2 sla Pr klad kap 2 alebo ods 2 1...
Page 328: ...ST SpA Via del Lavoro 6 31033 Castelfranco Veneto TV ITALY LWA...