DRAFT
90
Spohn & Burkhardt
4. Undo the lock nut (
21
) on the cable opening (
17
) and remove the corrugated tube (
22
),
5. Pull the cables out of the corrugated tube (
22
).
6. Undo the 5 screws (
19
) for the cover (
23
) on the spacer (
4
) and remove the cover (
23
).
7. Pull the cables through the cable opening (
17
).
10.2. Mechanical removal
1. Undo the 4 fastening screws from the fastening holes (
13
) in the mounting base (
8
).
2. Fasten suitable hoisting equipment to the control stand and lift the control stand out of the instal-
lation space.
Variant with spacer 52832; 43666 and 53153
1. Undo the 4 fastening screws M10 (
16
) on the spacer.
2. Fasten suitable hoisting equipment to the control stand and lift the control stand out of the instal-
lation space.
11. Disposal
The device is to be disposed of as per the national and international laws and regulations.
12. Reference documents
Technical data
You will receive the related technical data for each version of the control stand
FS
Dimension drawings
You will receive the related dimension drawings for each version of the control
stand FS
Circuit diagrams
You will receive the circuit diagrams for each version of the control stand FS.
Spare parts
You will receive the related spare parts list for each version of the control stand
FS.
Summary of Contents for FS Series
Page 46: ...DRAFT 46 Spohn Burkhardt 13 Konformitätserklärung ...
Page 47: ...47 Spohn Burkhardt DRAFT ...
Page 91: ...91 Spohn Burkhardt DRAFT 13 Declaration of conformity ...
Page 129: ...37 Spohn Burkhardt ...
Page 130: ...38 Spohn Burkhardt ...
Page 131: ...39 Spohn Burkhardt ...