DRAFT
66
Spohn & Burkhardt
1. Position the control stand in the installation location, during this process pay attention to the cor-
rect minimum distance to neighboring parts. The rotating and swiveling area of the control stand
must not be blocked.
2. Fasten the control stand in the installation location using 4 screws M10 through the fastening holes
(
30
) in the spacer (
4
) (tightening torque 35 Nm)
4.2. Electrical connection
Attention!
Make sure all cables are laid correctly without kinks or points where they can chafe.
Make sure the cable markers are not removed and mark new cables so they can be iden-
tified. Fasten together the cables using cable ties, if necessary. While laying cables, pay
attention to any bending radii specified by the manufacturer.
Figure 16.
21
21
22
20
22
27, 28
Cable entry
Summary of Contents for FS Series
Page 46: ...DRAFT 46 Spohn Burkhardt 13 Konformitätserklärung ...
Page 47: ...47 Spohn Burkhardt DRAFT ...
Page 91: ...91 Spohn Burkhardt DRAFT 13 Declaration of conformity ...
Page 129: ...37 Spohn Burkhardt ...
Page 130: ...38 Spohn Burkhardt ...
Page 131: ...39 Spohn Burkhardt ...