DRAFT
70
Spohn & Burkhardt
5. Undo the lock nut (
28
) on the cable opening (
27
) and remove the corrugated tube (
22
) from the
cable opening (
17
) on the consoles,
(see Figure 16 “Cable entry”, page 66).
6. Guide the corresponding cables through the
cable opening (
17
).
7. Pull the cables through the corrugated tube (
22
) and tighten the lock nut (
21
) for the cable opening
(
17
) on the spacer and the lock nut (
28
) for the cable opening (
27
) on the consoles.
8. Open the consoles
see section “Variant with spacer 53035 and 53207”, page 67 point 11.
9. Connect the corresponding cables as per
the related circuit diagrams (
and requirements of the operating organization.
10. Undertake setup,
(see chapter 5. “Setup”, page 70).
5. Setup
Danger!
All tasks on the device are only allowed to be undertaken by specialist personnel taking
into account the relevant safety regulations. Always pay attention to the safety instruc-
5.1. Function test
Danger!
Damaged control stands are not allowed to be operated.
1. Check the adjusting functions of the control stand FS as per
chapter 6. “Operation”, page 71
• If you are not able to operate one of the adjusting functions, take the control stand out of opera-
tion and contact SPOHN & BURKHARDT (
for address
2. Check the functions of the controls as per the requirements of the operating organization.
• If you are not able to operate one of the functions, take the control stand out of operation and
contact SPOHN & BURKHARDT (
for address
Summary of Contents for FS Series
Page 46: ...DRAFT 46 Spohn Burkhardt 13 Konformitätserklärung ...
Page 47: ...47 Spohn Burkhardt DRAFT ...
Page 91: ...91 Spohn Burkhardt DRAFT 13 Declaration of conformity ...
Page 129: ...37 Spohn Burkhardt ...
Page 130: ...38 Spohn Burkhardt ...
Page 131: ...39 Spohn Burkhardt ...